Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source: Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

.. - ,.
19
Y authtrity of E. c 1 1 G
hanged by C4?1 •'o <<=
/
GEMINI V
TECHNICAL DEBRIEFING (U)
Part 1
NOTICE: This document may be exempt from
public disclosure under the Freedom of lnfor•
mation Act (5 U.S.C. 552). Requests for its re
lease to persons outside the U.S. Government
should be handled under the provisions of
NASA Policy Directive 1382.2.
THIS MAT E RIAL CONTAINS INF'ORM.ATION AFl"IECTING
THE NATIONAL OEFENSE OF THE UN I TEO STATES
WITHIN THE MEANING OF' TH£ £8P'IONAGIE LAW 5 ,.
TITLE 11. U . S.C, SECTION 793 ANO 794 . T HE TRANS
M I SSION OR REVELAT I O N Of' WH IC H IN AN Y MANNER
TO AN UNA UTHORIZED PERSON IS PR OHIB ITE D av L AW.
GROUP 4
OOWNCiftAOEO AT ) V EA R I NTFRVALS,
OECL ASSI F'IEO AFTER 12 VE ARS
t
" 6 () t JF18Er4TI;\b

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.