Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source: Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

PRELIMINARY
GT- 5 FLIGHT CREW DEBRIEFING TRANSCRIPT
PART I
Prepared By
Spacecraft Operations Branch
Flight Crew Support Division
September 1 , 1965
This material contains informati on affecting the
national defense of the United States within the
meaning of the Espionage Laws , Title 18. U. S. C.
Section 793 and 794, the transmission or revela
tion of which in any manner to an unauthorized
person is prohibited by law.
Gr oup 4 : Downgrade at 3 year intervals
Declassified after 12 years

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.