Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 704 …Saw Bob Foster 731, also on way to NYC April 8 Mon. Arrived NYC 730 am…
  • p. 705 …I caught 550 train out of Penn Station to Red Bank, NJ April 29 Mon. Up…
  • p. 706 …1130 pm Owl to NYC May 6 Mon. Caught 625 train out of Penn Station to…
  • p. 707 Dec 2 Mon. Cakhurst. Cold wave hit about midnight - temperature down to $ 1 5^{\circ} $ - strong…
  • p. 708 …Dec 23 Mon. Oakhurst. Worked on Alamogordo and Flight 13. Had flight # 14 this pm. - 24…
  • p. 709 …Jan 13 Mon. Oakhurst. Working on sky wave curves. Made plans for Alamogordo this Thursday Jan…
  • p. 710 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 711 …Feb 24 Mon. Alamogordo. Waited for air transportation today but none available and may not be…
  • p. 712 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 713 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 714 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 715 …May 19 Mon Reynolds and I left about 0946. May 19 Mon Reynolds and I left…
  • p. 716 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 717 …Took Ireland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 718 …July 7 (Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 719 …Aug 4 Mon. Up to Oakhurst. Hunt Aug 4 Mon. Up to Oakhurst. Went over developments…
is not useful when the changes occur at a nearly constant altitude due to the width of the steps and the ambiguity of direction of vertical motion. Two pressure measuring systems have been found satisfactory for use in constant-level work and are discussed below. For a discussion of the radio transmitters which have been used (the standard T-69 and the NYU AM-1), see Technical Report No. 2, Balloon Project, New York University Research Division.

## (1) Olland Cycle Pressure Measuring Instrument

This instrument, shown in Figure 31, is used in balloon flights as the primary pressure measuring unit, as it will continuously measure pressure without ambiguity. It modulates the transmitted radio signal at intervals whose timing is determined by the pressure of the air at the balloon's position.

As presently designed, the modulator contains a standard Signal Corps ML-310E radiosonde aneroid unit, a rotating cyclinder of insulating material with a metal helix wound around the cylinder, and a 6-volt electric motor which rotates the cylinder.

There are two contacting pens which ride on the cylinder and conduct electrical current when they touch the helix. One pen is fixed in position and makes a contact at the same time in each revolution of the helix. This contact is used as a reference point for measuring the speed of rotation of the cylinder. The time that the second one, which is linked directly to the aneroid cell, makes contact with the spiral, is dependent on the cylinder speed and on the pen position which is determined by the pressure. By an evaluation chart, the atmospheric pressure can be determined as a function of the relative position of the pressure contact as compared to the reference thus eliminating all rotation effects but short term motor speed fluctuations.

Preparation of the modulator for flight consists of the following steps:

(a) Test the motor operation. When a 6-volt battery is inserted in the motor circuit with the proper polarity, the motor should run smoothly at one revolution per 60 to 80 seconds. Noisy operation is probably a sign of dirty or corroded

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.