The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 3 # THE ROSWELL REPORT # Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 8 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 25 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 27 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 61 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR SAF/AA FROM: AF…
  • p. 65 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 70 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 86 HEADQUARTERS 509TH BOMB GP (VH) ROSSELL AFFY AIR FIELD ROSSELL, NEW MEXICO GENERAL ORDERS) NUMBER 9…
  • p. 87 …Arner per Paragraph 3, Special Order, #139, Headquarters, Roswell Army Air Field, dated 18 July 1947…
  • p. 89 …Arner per paragraph 3, SO #139, Headquarters, this station, dated 18 July 1947. 1st Lt. Lewis…
  • p. 90 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 91 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 110 # HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Issuance of Orders ## TO: NND760168 Commanding General Air Material Command…
  • p. 119 …where we haven't squadron or group headquarters should take their people away. 1:55 P…
  • p. 131 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 136 …700 CIC was the CIC Headquarters.
  • p. 137 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 138 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 139 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 148 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 149 …And if anybody from headquarters CIC came in I'm positive they would have checked in…
  • p. 192 …I was assigned, believe it or not, to Headquarters, Air Force... I still have the Headquarters…
  • p. 230 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 231 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 246 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 269 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 278 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 306 …this local headquarters of the AMC under the Walton Laboratories group, who have headquarters at Red…
  • p. 325 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 327 …Reports of results were made to Headquarters FITZWILLIAM FORWARD and to AFMSW-1. Results of the…
  • p. 855 …Brady, all from Headquarters. Eighth Air Force, arrived here for a conference and inspecting and coordination…
  • p. 873 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
the balloon and permits gas to be introduced into the top of the cell first. As the balloon is laid out and shotbags are positioned, this tube must be kept clear. At the point where the bubble is pinched off the folds of the balloon are carefully divided; the inflation tube is made as free as possible with only one layer of polyethylene above and one below it. The tube is then pulled up above and between the arms of the releasing device or the heavy shot bags, and the remainder of the fabric is pinned down so that no shifting will permit premature release.

Depending upon the load to be lifted and the rate of rise desired, a pre-computed amount of helium is fed into the balloon (see Section IV, A). This amount is determined by noting the equilibrium pressure and temperature of the gas in each cylinder. A manifold is used to feed the gas from the tanks to the inflation tube in the balloon. Shown in Figures 26 and 27 this manifold system consists of an adjustable number of flexible pigtails leading into a main line of heavy copper tubing. This main line and the fittings are capable of withstanding the full tank pressure of about 2500 feet psi. Two pressure gages are included in the main line and it is thus possible to make last-minute checks of the amount of gas (pressure) in each tank. (Due to variable gage-calibrations, it has been found necessary to establish the lift-pressure ratio of each gage before using it.) In the main line of the manifold, two valves control the gas flow. The inflation tube is often initially twisted when the balloon is first laid out. A small amount of gas at very low pressure should be valved into the tube to strengthen it. In addition to the fine valve control required for this preliminary gas feed, it is also necessary for a manifold valve to permit high gas flow from the tanks even when the pressure is greatly reduced. For this, the coarse globe valve is used.

Once the tube has been checked, inflation should proceed as rapidly as possible. The balloon is outdoors and so subject to buffeting by the wind. The limiting factor of speed of inflation is the vibration of the fabric near the open end of the inflation tube.

As a result of the extreme cooling of the rapidly expanding gas, the manifold and the tank valve generally become coated with frost. Too rapid cooling may actually cause the valve to freeze shut.