Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 3 # THE ROSWELL REPORT # Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 8 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 25 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 27 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 61 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR SAF/AA FROM: AF…
  • p. 65 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 70 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 86 HEADQUARTERS 509TH BOMB GP (VH) ROSSELL AFFY AIR FIELD ROSSELL, NEW MEXICO GENERAL ORDERS) NUMBER 9…
  • p. 87 …Arner per Paragraph 3, Special Order, #139, Headquarters, Roswell Army Air Field, dated 18 July 1947…
  • p. 89 …Arner per paragraph 3, SO #139, Headquarters, this station, dated 18 July 1947. 1st Lt. Lewis…
  • p. 90 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 91 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 110 # HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Issuance of Orders ## TO: NND760168 Commanding General Air Material Command…
  • p. 119 …where we haven't squadron or group headquarters should take their people away. 1:55 P…
  • p. 131 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 136 …700 CIC was the CIC Headquarters.
  • p. 137 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 138 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 139 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 148 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 149 …And if anybody from headquarters CIC came in I'm positive they would have checked in…
  • p. 192 …I was assigned, believe it or not, to Headquarters, Air Force... I still have the Headquarters…
  • p. 230 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 231 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 246 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 269 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 278 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 306 …this local headquarters of the AMC under the Walton Laboratories group, who have headquarters at Red…
  • p. 325 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 327 …Reports of results were made to Headquarters FITZWILLIAM FORWARD and to AFMSW-1. Results of the…
  • p. 855 …Brady, all from Headquarters. Eighth Air Force, arrived here for a conference and inspecting and coordination…
  • p. 873 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
will cause the balloon to descend. Third, as a consequence of the previous limitation, the maximum floating period of a balloon with this control system is 24 hours, achieved when launching is at sunset.

When any or all of the above objections prohibit the use of this simple control system, more complex ballast dropping devices may be used. Figure 9 shows in schematic form the servo or demand type control which has been used to maintain balloons at a constant pressure level, with high ballast efficiency and without harmful sunset effects. Figure 10 is the ballast reservoir assembly which is used with this type control. A more detailed discussion of this servo-control is given in Technical Report Number 2 of the Balloon Project, New York University.

## C. Flight Termination Gear

When a balloon loses buoyancy by the loss of lifting gas, it sinks slowly to earth. To prevent the balloon from remaining in airplane traffic lanes for a long period of time, a flight termination device is added to the equipment train. This device, shown in Figure 11, consists of a pressure-actuated switch and rigging to tear a large hole in the balloon when it descends to some predetermined height. A pressure pen is held above its commutator by a short shelf (see Figure 12). After passing an altitude corresponding to the end of the shelf, the pen falls onto the commutator. Upon subsequent descent to 20,000 feet, it closes an electrical circuit. When this circuit is closed, a squib is detonated in an aluminum "cannon" (see Figures 13 and 14) driving a pellet through the main load line. As the line is severed, the weight of the load is suddenly taken by a rip line which extends nearly taut (about 2 feet slack) up the side of the balloon to a point about 10 feet below the balloon crown. At this point, two small holes about 18" apart have been made, and the rip line is passed from the outside into the balloon through the top hole, then down the inside and out the bottom hole. Both holes are securely taped with acetate fiber tape. About 6 inches of slack line is left inside the balloon. When the main line is cut, a large hole is made in the fabric by this rip line as it pulls out of the balloon. After the instruments have fallen about 10 feet and the rip is made, they are caught up by a snub line and the load is again taken to the load ring. The ruptured balloon then acts as a parachute for the load, descending at about 1000 to 1500 feet per minute.

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.