Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by GLM-OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 712 …equipment weighed - about 3500# total including TORRID. Edmonton, Reynolds, Thompson, Porter, Godbie? and I left about…
  • p. 713 …All T-21s changed over to Stds. Edmonton and Bill G went out to Lucero and…

Read from the scan by GLM-OCR; expect the odd misread word.

1947

March 9 Sun. Left Olmsted 0934 am - C47, Manjak and Schneider and landed at Newark 1130 Thompson and I took train to Asbury Park from Pa station. In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25, Parts 1 and 2. Started Eileen on V-2 rocket recordings.

March 11 Tues Oakhurst. Vivian and I worked on Flights 25, 24. Flight 26 off today, Part 1 at 9. part 2 at 2 pm. Good results! Eileen on V2 rocket March 7, Dona Site.

March 12 Wed Oakhurst. Vivian and I worked on records - Flight 26, and started Flight 23. Eileen worked on Dona site , V-2. Thompson and I went over Alamogordo plans.

March 13 Thurs Oakhurst. Worked with Vivian some on Flight 23 and 22. Worked on Tularosa site of V2-7 March. Eileen worked on Launching Site, V-2. Flight 27 today - at 12 noon and at 4 pm. Probably last of flights.

March 14 Fri Oakhurst. Vivian worked on identification of returns, last 4-5 cruises. gave good sky waves. Trakowski, Peoples and myselfwrote up report for General Reves on overall program to be hand carried by Thompson to Washington. Eileen worked on V-2 records, #21 March 15 Sat Oakhurst. Worked up survey of Launching Area and Tuleroso sites & plotted all sites on air map. Worked on V2 rocket March 7 records.

March 16 Sun Oakhurst. Worked on formula for sound correction until 2 pm - went over to McCurdys tonight.

March 17 Mon Oakhurst.Vivian plotted up all last sky waves. Worked on eqpt list for Alamogordo. Worked on formulas for wind correction.

March 18 Tues Oakhurst. Worked with V. Checked through all March 13 records. Worked on Woods Hole recordings pm. Elleen working on V-2 rockets.

March 19 Wed Oakhurst. Reviewed Flight 24A trying to get some azimuths from Oakhurst but records very poor. Reviewed records of Jan 23rd and started on stratosphere calculations. Eileen working on corrections Jan 20 V2 rocket from meteorological data. Baten? in from Florida Field Station, ready to go to Alamogordo next Tuesday.

March20 Thursday, Oakhurst. Went over final calculations for stratosphere data using seismic methods, of Jan 23 data with Vivian. Got V=325 at 3 kms. Studied azimuths on that data and got w = 10 m/sec coming from south on June 23rd. Worked with Eileen on rocket Jan 20thcorrecting for met data and plotting final H against X in kms from surface for up data.

March 21 Friday Oakhurst. Worked on Alamogordo plans - Lewis & Clowry over this pm and we went over all future plans including bombing for Alamogordo. Worked on rocket data with Eileen and on flight data with V, Stepanoff on ray paths of Dec 13

March 22 Saturday Oakhurst. Went over all V2 rocket data. Studied azimuth - elevation graphs & studied WAC Corporal of 3 March. Caught 534 train from Asbury Park - 1045 sleeper out of NYC

March 23 Sunday. At home. Arrived Canton about.9. Left on sleeper tonight about 8 pm March 24 Monday. Arrived NYC about 7. At 0930 went up to Math Department at NYU - Washington Square. Met Mr Bennett of WL. Found that Dr. Courant would not be in until late and decided not to wait but caught 1040 train to Asbury Park. Went over shipment ready for Alamogordo and over work for Vivian and Eileen. Packing tonight.

March 25 Tuesday Truck at Oakhurst at 9 with scales - all equipment weighed - about 3500# total including TORRID. Edmonton, Reynolds, Thompson, Porter, Godbie? and I left about 10 and went through to Mitchell Field in staff car. B-17, Carroll, pilot -- co-pilot. Left Mitchel Field about 3 pm. High level winds - went southern route - stayed at Maxwell Field Alabama tonight. Thompson stayed behind waiting for B-45

March 26 Wednesday. Left Maxwell Field, Alamabout 9 and landed in Alamorgoro 3 pm March 27 Thursday Alamogordo. Phil, Reynolds and I went out to Tower site, took in all wires, Pulled down tent and Rubicon equipment and took it over to new site west of Lake Lucero. Strung out wire, surveyed in site & set up Rubicon tent. Sal, Edmonson, Godbie?, Porter weighing in equipment in Alamogordo air base.

March 28 Friday. Alamogordo. Went out with Godlers, Porter to White Sands west of air base. Located site and surveyed it, put up shelter and set up GR3. Phil and Reynolds went up to Tularosa site, Sal and Edmondson worked on GR8 and low frequency equipment. Thompson in with B-45 from Newark.

## March 29 Sat Alamogordo

March 30 Sun Alamogordo. Phil and I went out to Dona site and picked up some equipment and then out to Lucero site. Set up Rubicon and took a record. Tried to get through to Tularosa site west of White Sands but couldnt find road.

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.