Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 118 …Robert Gross and Mr. Maher of Lockheed 11:55 A.M. Gen. Sam Anderson 12:00…
  • p. 393 …in the form of an altitude vs. gross load chart with helium as the lifting gas…
  • p. 394 …4}{\text {Gross Load}} = \frac {K}{W} $$ In turn, $ \frac{K}{W}=a e^{-0. 4…
  • p. 395 …free lift in pounds and G is gross lift in pounds. Although this equation was derived…
  • p. 400 …By equation (10), with a gross load of 52 kg., the unbalance caused by loss of…
  • p. 412 …or a gross buoyancy of 450 lb., the maximum allowable inflation of a 30' diameter, .001…
  • p. 479 …accelerating force equal to 5% of the gross load (52 kg) was acting to bring the…
  • p. 552 …000 feet. In one step, this becomes: Gross Lift/Balloon = (Balloon Volume) x (Difference in molecular…
  • p. 555 …of rise in feet per minute G = gross lift in grams For our purposes, we wish…
  • p. 559 …G) ^ {\frac {2}{3}} $$ (Approximate) where G = gross load A chart, Figure 24, has beendrawn up…
  • p. 561 …where $ \triangle G= $ loss of lift G = gross load (balloon weight plus equipment load) $ \triangle T…
  • p. 562 …not including balloon or its integral parts. Gross load: Load on the gas at release (Balloon…
  • p. 635 …Serial No. ___ description ___ ___ Line length ___ Banner description ___ ___ Ballast assembly - description ___ ___ Eallast. ___ Total Equipment Weight. ___ Gross Load ___
  • p. 636 …Gross Load . . . ___ Assumed Gross Lift (Gross Load + 10%) G ___ G 2/3 ___ Free Lift - F = $ (\frac…
  • p. 649 …theoretical altitude determined by the displacement and gross load. ## 7. Control systems Two systems of control…
  • p. 681 …By adjusting the gross load to be supported by the gas to equal the total lift…
  • p. 691 …A chart showing the relation between altitude, gross lift, and balloon size has been found necessary…
  • p. 775 …The gross load reported should be accurate to the nearest 200 grams. The amount of lifting…
  • p. 777 500 gm DRAG CHUTES 300 " BANNER 2000 " PAYLOAD 4500 " BALLOON 7300 " GROSS LOAD ## NOTE: Use low…
  • p. 779 …bubble length and resultant inflated volume, using gross lift as an expression of volume. It will…
  • p. 781 …in Appendix II summarizes the relationship between gross load and floating level for balloons of several…
  • p. 817 …A can of sand is made to weigh the same amount as the required gross lift…
  • p. 825 …the balloon with the equipment load attached. Gross Lift: Lift of all of the gas in…
  • p. 830 …Serial No. ___ description ___ Drag chute ___ ___ Banner description ___ ___ Ballast assembly - description ___ ___ Ballast ___ Total Equipment Weight . ___ Gross Load . . . . . . . . . . . . . . . . ___
  • p. 831 …waiting___ grams Actual balloon lift . . . . . . . . . . . ___ " AActual gross lift (Balloon lift & balloon wt.) . . . . . ___ " Number Helium tanks required…
  • p. 835 …Gross Lift vs. Bubble Length . . . . . . . 107 Graph 3: Buoyancy vs. Altitude . . . . . . . . . . 108 Graph 4: Gross Load…
  • p. 847 …Estimated Gross Load Limit kg. Altitude Range ft. 7 200 0.6 1.5 to 5…
April 2 Tues D & I left caracas Pan Am bus 9 pm. Arrived Miami 10 pm on Pan Am. through customs and caught 1 am National Airlines plane for Newark

April 3 Wed Arrived Newark 730 am and took airline bus to NYC. D left for Providence 9 am. Called up Twing but he was in Chicago - due back tomorrow. Left on 1040 sleeper for Canton tonight.

April 6 Sat At home. Over to Cgdensburg to see Steve this pm

April 7 Sun. Left Canton on 805 sleeper. Saw Bob Foster '31, also on way to NYC

April 7 Sun. Left Canton on 805 sleeper. Saw Bob Foster 731, also on way to NYC

April 8 Mon. Arrived NYC 730 am. Up to Columbia University to see Ewing 130 pm. Wyckoff and Dove on way to Los Angeles py plane this pm. Crane and Morrison in also from Watson Labs. Went back to Red Bank with them in ANUS car to Officer's Club near Watson Lab. Crane, Morrison and I went up tonight to see Reinnegle at office. Met Gifford who has 90' sea rescue boat this project is planning to use. Stayed at Officer's Club tonight

April 9 Tues. At Watson Labs all day. Went through all processes necessary for employment under Civil Service. Warrant Officer Gifford transferred to WLERL-4 today. McCurdy already in and started work. Talked with Reinnagle and Gallo re Columbia contract. Gifford left pm for Washington, Major Crane for Camp Dix and Morrison for NYC. Reinnagle and I went down to CO this pm to meet group from Cornell extension at Buffalo - Aeronautical research wanting to get contracts. Stayed at Molly Pitcher Hotel in Red Bank tonight

April 10 Wed Checked out of Molly Pitcher Hotel and caught 730 am train out of Red Bank to NYC. Checked in at Hotel Webster and then up to Ewings at Columbia University. Mr Gallo of Watson Labs in at 10 am and we went over contract questions regarding Watson Lab contract with Columbia until 1 PM. Went over all parts of work with Doc from 2 to 530 pm. John Ewing in from Missouri.

April 11 Thurs. Worked on rough outline of Eglin Field and SOFAR project Am. Up to see Swing at Columbia PM. Doc and I went over contract with Watson Lab & Columbia tonight. Caught 1205 sleeper to Boston.

April 12 Fri. Arrived Woods Hole about 11. Joe Worzel went over all sound transmission work at WHOI this pm.

April 13 Sat. Talked with Columbus Iselin this Am regarding Watson Lab work and needs. Crane and Gifford up pm and Joe and I went up to lab with them.

April 14 Sun. Down to lab this am with Joe looking for G9A files. Jim Peoples over about noon for awhile. Joe and I went golfing pm. Took 600 pm train to Boston and 1230 sleeper to NYC. Up to Boston with Lt Frank Ryder with Navy and WHOI

April 15 Mon. Contacted Doc Ewing in NYC and rode down to Red Bank with him. Talked over instrumentation of upper atmosphere investigations. Out to Oakhurst this pm. Conference with Col. Cole and Col. Grough re Project 188-5 and regarding microseisms. Doc and I went back to Molly Pitcher Hotel in Red Bank tonight.

April 16 Tues. Rode out to Watson Labs with Ewing. Went over to Evans Labs with Harry Davis Watson Lab navigation man, and saw newly developed ranging apparatus and talked to Lt Rydetor? re Spherics, location of lightning and thunderstorm data collected during past

few years. Saw Col. Duffy of Meteorological Division AAF and back to Watson Labs. Doc went on through to NYC. Vent over program with Dove and Crane this pm. Back to lab tonight with Crane and Gifford, discussing Project 185-7-1. Back to Myrtle Hotel at 1045 pm.

April 17 Wed. Rode out to Watson Labs with McCurdy. Worked with Major Crane on report regarding underwater work, Eglin Field and deep water. Took this in to Colonal Cole this pm. Acceptance probable. Got room in private house in Red Bank. Moved out of Molly Pitcher Hotel.

April 18 Thurs. Caught bus out to Watson Lab. Col Cole up this am and advised writing new Cost Expenditure for and revising the R. & R. Major Crane left about noon for trip Phila and Woods Hole. Made arrangements to meet him in NYC Monday. Wrote out new R & R and Cost Expenditure ready to take to Col Cole.

April 19, Fri. Talked over work with Dove and we wrote up 2nd EO covering all ocean work. Talked to Ewing on phone this am. Dove and I went down to see Col Cole and then wrote up new EO for deep water work. Saw Hincke? regarding this EO and A for P processed this pm and ready to go out to Wright Field.

April 20 Sat. Caught 710 train to NYC, cashed check at Chase Natl Bank, talked to Ewing on phone. Back to Red Bank about 4 pm.

April 22 Mon. At Watson Labs this am. Got final physical exams. Down to Supply to see Major Morris with Reinnagle re getting equipment out that came from WHOI without paper coverage. Got travel order back and authority to use it. Caught 342 pm out of Red Bank and arrived

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.