The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 6 …possible without the expert assistance and outstanding cooperation of many persons and organizations. Appreciation is extended…
  • p. 17 …These were to continue the cooperative wartime relationship between civilian research institutions and the military, and…
  • p. 152 …have imagined a lot of things and cooperated more. MC: Well, that's what Doyle said…
  • p. 306 …The C of C is asking the cooperation of all of the C of Ch in…
  • p. 708 …Made arrangements for cooperation with Evans in coming tests. Jan 4 Sat. At Oakhurst about 3…
  • p. 723 …Haynes Request for Big Springs radio-sonde station to monitor Alamo-gordo flights Active cooperation received…
## III C 1. General Work Accomplished.

The period was spent in preparatory work which consisted of the following phases:

Phase 1. The designing of a balloon and of altitude controls to be used as tentative solutions to the main problem.

2. The contacting of plastic film fabricators to obtain several sources of supply for large non-extensible balloons. To date, one subcontract has been let for 15 ft. diameter balloons.

3. The contacting of an instrument company which would construct the altitude control devices. A subcontract has also been let for altitude controls.

4. The designing of a large balloon inflation shelter at N. Y. U. Materials have been procured for it. Due to change in plans the shelter will not be built at N. Y. U. therefore the materials are being held for the government until termination of contract.

5. The repairing and testing of the radiosonde receptor in Department of Meteorology for preliminary flights pending the arrival of Government-loaned equipment.

6. The preliminary flights with clusters of Meteorological balloons as stop-gap methods to attempt constant level balloon flights while awaiting the delivery of N. Y. U. designed equipment.

7. The making of preliminary calculations and requirements on constant level balloon performance.

## 2. Specific Problems.

Yet to be determined is the relative merits of various balloon films and fabrics available. This is to be handled by test work done by