Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 704 …Saw Bob Foster 731, also on way to NYC April 8 Mon. Arrived NYC 730 am…
  • p. 705 …I caught 550 train out of Penn Station to Red Bank, NJ April 29 Mon. Up…
  • p. 706 …1130 pm Owl to NYC May 6 Mon. Caught 625 train out of Penn Station to…
  • p. 707 Dec 2 Mon. Cakhurst. Cold wave hit about midnight - temperature down to $ 1 5^{\circ} $ - strong…
  • p. 708 …Dec 23 Mon. Oakhurst. Worked on Alamogordo and Flight 13. Had flight # 14 this pm. - 24…
  • p. 709 …Jan 13 Mon. Oakhurst. Working on sky wave curves. Made plans for Alamogordo this Thursday Jan…
  • p. 710 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 711 …Feb 24 Mon. Alamogordo. Waited for air transportation today but none available and may not be…
  • p. 712 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 713 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 714 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 715 …May 19 Mon Reynolds and I left about 0946. May 19 Mon Reynolds and I left…
  • p. 716 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 717 …Took Ireland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 718 …July 7 (Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 719 …Aug 4 Mon. Up to Oakhurst. Hunt Aug 4 Mon. Up to Oakhurst. Went over developments…
Flight 94: Released from Alamogordo, New Mexico, 1208 MST, September 3, 1948 Recovered At Villa Ahumada, Chihuahua, Mexico

On this flight, a fourth attempt was made to sustain a Seyfang, neoprene-coated nylon balloon. On Flight 79, a previous Seyfang flight, no ballast equipment had been in operation, and so a careful record of ballast flow on Flight 94 was desired. This was provided by a ballast meter. In addition to this and the barograph and Olland pressure-measuring instruments, a thermograph was also part of the equipment train.

The height-time curve (Figure 43) shows that the initial buoyancy surplus of this balloon (for the most part due to superpressure held behind

Figure 43

the safety valve) was reduced by diffusion so that after one hour of floating it began to descend at an accelerating rate. After falling about 2000 feet, the automatic ballast valve began to operate, and ballast was discharged at the rate of 20 grams per minute. During the descent, however, the strong superheat which the balloon had acquired was reduced by ventilation.

The adiabatic lapse rate of helium is $ 2^{\circ} \mathrm{C} $ per kilometer, whereas air in the troposphere warms up about $ 6^{\circ} \mathrm{C} $ with each kilometer of descent. This means that with each kilometer of fall, the lifting gas was cooled relative to the air by an additional $ 4^{\circ} \mathrm{C} $ . The combination of inertia, loss of superheat through ventilation, and adiabatic cooling of the gas as it was compressed, proved too great for the limited flow of ballast through the automatic valve, and the balloon fell unchecked to the ground.

From Flight 79, it was determined that superheat of nearly $ 4 0^{\circ} \mathrm{C} $ is built up when Seyfang balloons are flown in the sunshine. If this were lost, the buoyancy of the balloon would be reduced by one-sixth, and no satisfactory control could be achieved by ballast dropping.

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.