Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 3 # THE ROSWELL REPORT # Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 8 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 25 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 27 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 61 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR SAF/AA FROM: AF…
  • p. 65 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 70 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 86 HEADQUARTERS 509TH BOMB GP (VH) ROSSELL AFFY AIR FIELD ROSSELL, NEW MEXICO GENERAL ORDERS) NUMBER 9…
  • p. 87 …Arner per Paragraph 3, Special Order, #139, Headquarters, Roswell Army Air Field, dated 18 July 1947…
  • p. 89 …Arner per paragraph 3, SO #139, Headquarters, this station, dated 18 July 1947. 1st Lt. Lewis…
  • p. 90 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 91 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 110 # HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Issuance of Orders ## TO: NND760168 Commanding General Air Material Command…
  • p. 119 …where we haven't squadron or group headquarters should take their people away. 1:55 P…
  • p. 131 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 136 …700 CIC was the CIC Headquarters.
  • p. 137 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 138 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 139 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 148 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 149 …And if anybody from headquarters CIC came in I'm positive they would have checked in…
  • p. 192 …I was assigned, believe it or not, to Headquarters, Air Force... I still have the Headquarters…
  • p. 230 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 231 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 246 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 269 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 278 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 306 …this local headquarters of the AMC under the Walton Laboratories group, who have headquarters at Red…
  • p. 325 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 327 …Reports of results were made to Headquarters FITZWILLIAM FORWARD and to AFMSW-1. Results of the…
  • p. 855 …Brady, all from Headquarters. Eighth Air Force, arrived here for a conference and inspecting and coordination…
  • p. 873 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
its bursting diameter, the gear strikes the ground, or corrective action is taken. Even if the extremely critical balance is initially achieved, there will be unbalance occasioned by (1) bursting of balloons due to deterioration in the sunlight, (2) diffusion of lifting gas from the balloons, (3) loss or gain of buoyancy when temperature inside the balloon changes with respect to the ambient air temperature. This will result initially from radiative differences, and after an amount of difference (superheat) has been established, changes in ventilation will cause changes in buoyancy.

Two methods of attaching the payload to the clusters of rubber balloons were tried. In the first of these (Figure 3) a long load line was used, and short lines led from it to the individual balloons. The length of such arrays was as much as 800 feet, and this size made them difficult to launch. The single load ring array, seen in Figure 4, proved to be much easier to handle and is recommended for cluster launchings. During ascent each of the balloons in such an array ride separated from each other and no rubbing or chafing has been observed.

The controls which were associated with this balloon system were crude and, in general, ineffective. They included (1) cutting off balloons as the buoyancy became excessive and a preset altitude extreme was passed, and (2) releasing part of the load in the form of solid or liquid ballast whenever descent occurred. The sensitivity of these elastic balloons makes it difficult to control their altitude with any system of controls, and as controls were developed it was found more practical to change from freely expanding balloons to non-extensible cells not made of neoprene. The tendency of neoprene to decay within a few hours when exposed to sunlight was the most cogent argument against doing more work on altitude controls to be used with such a system.

## B. Plastic Balloons

The next attempts to control the altitude of a balloon vehicle were made using non-extensible plastic cells, with an open bottom to prevent rupture when expansion of the lifting gas is excessive. With a fixed maximum volume, such a system has inherent vertical instability in only one direction. When full, there is a pressure altitude above which a given load will not be carried. The instability of such a system is found only when an unbalanced downward force exists. The development of controls and films for balloon material proceeded concurrently, but the choice of a non-extensible plastic film was made before the system of control was perfected.

The properties which were given most consideration in the selection of fabric include (1) availability and cost, (2) ease of fabrication and (3) satisfactory chemical and physical properties. Pri-

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.