Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 3 # THE ROSWELL REPORT # Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 8 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 25 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 27 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 61 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR SAF/AA FROM: AF…
  • p. 65 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 70 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 86 HEADQUARTERS 509TH BOMB GP (VH) ROSSELL AFFY AIR FIELD ROSSELL, NEW MEXICO GENERAL ORDERS) NUMBER 9…
  • p. 87 …Arner per Paragraph 3, Special Order, #139, Headquarters, Roswell Army Air Field, dated 18 July 1947…
  • p. 89 …Arner per paragraph 3, SO #139, Headquarters, this station, dated 18 July 1947. 1st Lt. Lewis…
  • p. 90 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 91 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 110 # HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Issuance of Orders ## TO: NND760168 Commanding General Air Material Command…
  • p. 119 …where we haven't squadron or group headquarters should take their people away. 1:55 P…
  • p. 131 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 136 …700 CIC was the CIC Headquarters.
  • p. 137 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 138 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 139 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 148 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 149 …And if anybody from headquarters CIC came in I'm positive they would have checked in…
  • p. 192 …I was assigned, believe it or not, to Headquarters, Air Force... I still have the Headquarters…
  • p. 230 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 231 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 246 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 269 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 278 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 306 …this local headquarters of the AMC under the Walton Laboratories group, who have headquarters at Red…
  • p. 325 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 327 …Reports of results were made to Headquarters FITZWILLIAM FORWARD and to AFMSW-1. Results of the…
  • p. 855 …Brady, all from Headquarters. Eighth Air Force, arrived here for a conference and inspecting and coordination…
  • p. 873 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
To use the first of these principles it is possible to main- tain a condition of buoyancy by at least the following two me- methods: (1) dropping a part of the load, as ballast, to match the loss of lifting gas which occurs as a result of diffusion and leakage; (2) replacement of the lifting gas by evaporation from a reservoir of liquified helium or hydrogen. Of these two methods, ballast dropping is most satisfactory from the consideration of simplicity of control and safety of personnel. While the use of liquid helium is theoretically more efficient, the amount and com- plexity of control equipment adds much to the cost and also the weight of air-borne equipment.

The development of non-elastic balloons which can withstand high internal pressure was investigated. Two designs which compromise extreme cost (required for balloons of high internal pressure) with small wall strength, hence small super pressure, were tested.

At first, attempts were made to control balloon performance by using buoyancy-load balance techniques with elastic balloons, but the difficulties which were experienced resulted in the development of a third principle of operation combining a non-extensible balloon with a system of controls which can be applied either to a freely expanding balloon or to a balloon of fixed volume.

## III. METHODS OF ATTACK

The work on the development of controlled-altitude balloons may be divided into three phases, each one identified by the type of balloon which was used. Concurrent with the balloon development was the design and testing of control equipment required to maintain the balloon at specific altitudes. Some of the equipment instrumentation was used on more than one kind of balloon, but in general the problems and methods of attack are identified with one of the three types of balloons.

## A. Rubber Balloons

Following the example of Clarke and Korff, assemblies of neoprene rubber balloons were first considered. Using these freely expanding balloons it was necessary to balance the load to be lifted with the buoyancy given by an integral number of balloons. One or more accessory balloons were attached to the assembly to provide lifting force to carry the train aloft. With the gear at a predetermined altitude, the lifting balloons were cut loose from the train by a pressure-activated switch, leaving the equipment at floating level, more or less exactly balanced. Since there is no inherent stability in an extensible balloon, any existing unbalance will cause the train to rise or fall indefinitely until the balloon reaches

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.