Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 15 …Gen Roger M. Ramey Col William H. Blanchard Maj Gen Clements McMullen Brig Gen Donald N…
  • p. 33 …Additionally, this history showed that the 509th Commander, Colonel Blanchard, went on leave on July 8…
  • p. 34 the supposed first ever recovery of extraterrestrial materials. (Detractors claim Blanchard did this as a ploy…
  • p. 43 …Additionally, it seems that there was overreaction by Colonel Blanchard and Major Marcel in originally reporting…
  • p. 65 …William Blanchard, the Public Information Officer, Walter G. Haut, issued a news release that the Amry…
  • p. 87 …on 8 July 1947. Colonel W. H. Blanchard, Commanding Officer went on leave. Lt Colonel Charles…
  • p. 88 …Colonel Oliver LaFarge, Air Reserve Corps, at Santa Fe, made arrangements for Colonel Blanchard to visit…
  • p. 89 …Colonel Blanchard spoke on the future of the Air Force, and the talk was very well…
  • p. 135 …Colonel Blanchard. RW: Oh yeah. Excuse me, Colonel Blanchard. SC: He was the Wing Commander of…
  • p. 138 …The first picture is actually with Jesse Marcel and that's General Blanchard and... SC: I…
  • p. 143 …Colonel William Blanchard and the other officer suggested that Marcel and CIC agent accompanied Brazel to…
  • p. 145 …O.K. "Blanchard, who was still at the base...ordered Marcel to accompany the rancher back…
  • p. 147 …Albuquerque rather than Fort Worth and although Blanchard outranked the CIC agent (meaning yourself) a phone…
  • p. 154 …time and we don't know if Blanchard knew about that or not: (we don't…
  • p. 155 …crash at the request of Marcel; maybe Blanchard, and I probably took Rickett with me. We…
  • p. 160 …The things that Ramey and Blanchard used to! Blanchard came over to the Philippines. I think…
  • p. 219 …What about then Colonel Blanchard and General Ramey? Do you think they may have had any…
  • p. 855 ## CHAPTER XIII # VISITORS and EXECUTIVE CALENDAR 3 September 1947 - Colonel Blanchard and Lt. Haut went to…
  • p. 864 …Roger M. Ramey and Col. William H. Blanchard. Brig. Gen. Roger M. Ramey was the Commanding…
  • p. 865 …As commander of Roswell Army Airfield and the 509th Bomb Group, Blanchard is alleged to have…
b. The construction by the contractor of an experimental air borne radio and associated air borne or ground receiving equipment which will transmit and receive information from a mechanical movement introduced into the radio circuit. The weight of the pick up device and any required power supply to be carried in the balloon will not be over 2 lbs.

c. The contractor will fly the balloons, track them, and collect the data on pressure and temperature to be transmitted as the balloon goes up and at periodic intervals at flight altitude. These intervals to be determined by consultation. The accuracy is to be comparable to that of the standard Army Radiosonde.

d. Interpretation of Meteorological data in connection with project.

Five copies of reports of design and development phases were to be delivered at monthly intervals. Results of meteorological studies were to be transmitted as completed to the sponsoring agency for use of Air Force scientific personnel.

On 27 February 1948, Modification #1 revised the number of copies of reports to be furnished to 25. Modification #2, of 2 April 1948, added the requirement of "Research Investigation, and Engineering services leading to the determination of the dependance of the propagation of sound on atmospheric conditions", to the contract. Contract funds were increased to cover this additional requirement.

Under Modification #3 of 23 April 1948,it was agreed that a separate final report on telemetering from Balloon Systems would be completed and transmitted to the sponsor. The time of performance was extended to 1 February 1949 and contract funds increased to cover the increased period of performance by Modification #4 to the contract on 29 September 1948.

On 28 October, 1948, the number of reports required was increased to fifty (50) and the place for final inspection and acceptance charged to Cambridge Field Station, AMC by Modification #5. Modification #6 changed the allotment for funds to be used on the project. The period of performance of the project was extended to 50 March 1949, by Modification #7 of 26 January 1949.

Modification #8 of 8 April 1949, modified the requirement to that of maintenance of one trained person in the field to carry out balloon launching and tracking services in conjunction with Air Force scientific personnel. Funds were increased to extend the

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.