Documents / Report
The Roswell Report: Fact vs. Fiction in the New Mexico Desert
USAF / The Black Vault · 1995 · 882 pages · text by OCR
The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.
“Sea”23 pages
- p. 193 …overhead and followed the balloons out to sea. I have no idea about the results that…
- p. 200 …the regular 334 that we had at sea level. From that they could deduce the temperature…
- p. 243 …actually located on the jurisdictional lines between Sea Girt and Springlake, New Jersey. It was an…
- p. 244 …The Sea Girt Inn?
A: Exactly. That's where John had his office, and I was…
- p. 320 …alone is about 24,000 miles at sea level, and about 4500 miles at 45,000…
- p. 325 …twenty-five (25) feet at their largest sea-level diameter. The sonic unit was a combination…
- p. 378 …per hour when one-fifth inflated at sea level).
One other type of balloon which has…
- p. 402 …Let us, then, compare the rate of leakage at any given altitude with leakage at sea…
- p. 404 …The leakage at any altitude may be expressed as a function of leakage at sea level…
- p. 405 Comparing rate of leakage at 40,000 feet with leakage at sea level:
$$
\frac {L _ {4…
- p. 407 …If a 20-foot diameter balloon $ \frac{1}{1 0} $ full were tested at sea level…
- p. 408 …At sea level this is equivalent to 5.32 gm/hr. for a 20-foot diameter…
- p. 414 …Using the rules of subsonic aerodynamics, Picard suggests that air at sea level escaping at 1333…
- p. 415 …air at sea level (lb./ft. $ ^{3} $ )
14.7 = pressure of air at sea level (psi…
- p. 432 …to about 20 millibars and increased to sea-level pressure at different temperatures.
The most comprehensive…
- p. 563 …The height above mean sea level as determined from pressure measurements used in this work with…
- p. 644 …point at which the radiosonde reaches the sea surface.
## 2. Earlier attempts
There have been numerous…
- p. 645 …The balloons floated between the surface and 30,000 ft above sea level; those which reached…
- p. 704 …Met Gifford who has 90' sea rescue boat this project is planning to use. Stayed at…
- p. 719 …Worzel working on gravity at sea. Saw Geo Woollard and the Ryders. Woollard after Guggenheim fellowship…
- p. 779 …the launching site is markedly different from sea level, a shift in this curve is needed…
- p. 817 …balloon at all times with respect to sea level. On this curve also it is customary…
- p. 825 …The height above mean sea level as determined from pressure measurements used in this work with…
# XXXXXXXXXXXXXX
MATERIEL
TSELT
MEMORANDUM FOR: Major General Curtis LeMay
SUBJECT: Relief of Major R. T. Crane as Project Officer for MOGUL and TORRID
1. In compliance with General Spaatz' directive, I contacted Dr. M. Ewing at Columbia University on 15 June 1946 and discussed the proposed relief of Major R. T. Crane as project officer on projects MOGUL and TORRID.
2. Dr. Ewing was exceedingly pleasant and agreed to the relief of Major Crane, asking only that it be done in such a way as to cause as little embarrassment to any of the parties concerned as possible. I advised him that the matter would be handled diplomatically.
3. I then discussed with Dr. Ewing the subject of a successor to Major Crane and suggested to him that Colonel Marcellus Duffy, a Regular Army officer and well-qualified on meteorological research and development work, might be made available for this duty. Dr. Ewing advised that he believed that he could work well with Colonel Duffy if he is assigned to this work. It was further agreed that as soon as a project officer is finally selected, a conference would be held with Dr. Ewing and the new project officer and Colonel Maier and Colonel Graul in order that there will be a clear understanding as to the objectives to be accomplished.
TOM C. RIVES Brig. General, USA Chief, Electronic Subdivision Engineering Division
About this file
Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.