Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by GLM-OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 3 # THE ROSWELL REPORT # Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 8 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 25 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 27 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 61 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR SAF/AA FROM: AF…
  • p. 65 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 70 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 86 HEADQUARTERS 509TH BOMB GP (VH) ROSSELL AFFY AIR FIELD ROSSELL, NEW MEXICO GENERAL ORDERS) NUMBER 9…
  • p. 87 …Arner per Paragraph 3, Special Order, #139, Headquarters, Roswell Army Air Field, dated 18 July 1947…
  • p. 89 …Arner per paragraph 3, SO #139, Headquarters, this station, dated 18 July 1947. 1st Lt. Lewis…
  • p. 90 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 91 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 110 # HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Issuance of Orders ## TO: NND760168 Commanding General Air Material Command…
  • p. 119 …where we haven't squadron or group headquarters should take their people away. 1:55 P…
  • p. 131 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 136 …700 CIC was the CIC Headquarters.
  • p. 137 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 138 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 139 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 148 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 149 …And if anybody from headquarters CIC came in I'm positive they would have checked in…
  • p. 192 …I was assigned, believe it or not, to Headquarters, Air Force... I still have the Headquarters…
  • p. 230 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 231 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 246 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 269 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 278 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 306 …this local headquarters of the AMC under the Walton Laboratories group, who have headquarters at Red…
  • p. 325 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 327 …Reports of results were made to Headquarters FITZWILLIAM FORWARD and to AFMSW-1. Results of the…
  • p. 855 …Brady, all from Headquarters. Eighth Air Force, arrived here for a conference and inspecting and coordination…
  • p. 873 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…

Read from the scan by GLM-OCR; expect the odd misread word.

S U L M A N Y O N Y U C O N S T A N T - L A V A L B A L L U O N F L I U G H T S

PLATFORM NUMBER	DATE AND BALLOON SIZE	BALLOON BALLOON	BALLOON BALLOON	MAGNIFICATION OF BALLOON	TOTAL WEIGHT OF BALLOON INCLUDING BALLOON	DESCRIPTION OF ALTITUDE CONTROL	BALLOON HEIGHT	FREELIFT	MALLOON LIFT	MADIUSOND RECEPTION%	TRACKING%	ALIANCE OBSERVATION%	FLIGHT DURATION	OPTIMUM CONSTANCY	MAXIMUM CONSTANT LEVELS MSL	Recovery & LAND IMG SITE	CRITICUM
11	7 July 1947 0508 MST	Alamogordo New Mexico	7-General Mills 1-15'.008" polyethylene 6-7'.001" polyethylene in balloon cluster below 15' balloon	17.1kg	74.5mc Radiosonde Ballast assembly	15.9kg	Dribbler Compass fluid Fixed leak 300 gm/hr	3kg	11.3kg	27.2kg	97% with recorder	Theodo-lite 38%	100% G-54	550 min.	423 min.1500'	Max.10000' Const.16000'	0%	Balloons used in cluster to obtain higher altitude. In high wind at launching 3 small balloons deflated. Therefore cluster did not rise high enough to activate altitude control. Dribbler leak and balloon diffusion both 300 gm/hr. Therefore balloon remained at ceiling until balloon was expanded.
12	5 Aug.1947 0714 LST	Lakehurst New Jersey	1-General Mills 20'.001 Polyethylene	4.1kg	3mc transmitters 39.7mc Radiosonde 72.2mc Radiosonde Ballast assembly	26.0kg	Automatic and manual ballast valves and minimum pressure switch	5kg	3.8kg	31.8kg	100% Hillman	Theodo-lite 15% SCR-658 80%	85%	407 min.	60 min.400'	Max.14100'	95% Smyrna, Delta-ware 85ml.	First flight with large this balloon. Open appendix caused helium dilution with air cover over appendix thought to have caused balloon rupture, terminating flight early and low. Flight not successful as balloon test or altitude control test.
13	5 Sept.1947 0647 MST	Alamogordo New Mexico	2 General Mills 20'.001" Polyethylene.10 appendix inside shroud lines	8.4kg	397mc Radiosonde Data Gear Ballast release	24.2kg	Automatic Ballast release assembly	10.0kg	3.8kg	28.0kg	100%	Theodo-lite 100% SCR-658 100%	Not required Burst over desert	58 min.	None (burst)	Max.4760'	0% White Sands. N.M.	Appendices twisted around shroud lines, preventing valving of gas at pressure altitude. Both balloons burst within 2 minutes and gear fall free to desert. Recovery not attempted.
14	6 Sept.1947 0613 MST	Alamogordo New Mexico	1 General Mills 20'.001" Polyethylene.10 appendix outside shroud lines	4.0kg	397mc Radiosonde Banner Ballast release	15.1kg	Automatic Ballast release assembly	5.0kg	2.2kg	17.3kg	100%	Theodo-lite 100% SCR-658 100%	Last 10%(L=5)	55 min.	None (burst)	Max.49000'	100% 6 mi. north of Alamogordo AAF	Appendix again twisted around shroud lines, preventing valving of gas at pressure altitude, where balloon burst. Desert retarded by banner.
15	6 Sept.1947 1153 MST	Alamogordo New Mexico	1 General Mills 20'.001" Polyethylene.1 appendix outside shroud lines	4.0kg	397mc Radiosonde Banner Ballast release	15.1kg	Manual ballast valve. Fixed rate of leak 1000 gm/hr	5.0kg	2.6kg	17.7kg	364 min.	Theodo-lite 175 min. SCR-658 364 min.	Not required Accurate data not required	More than 364 min.	71 min.900'	Max.45800' Const.34000'	0%	First flight with large G.M. balloon which did not burst due to appendix. Believe holes in balloons due to high wind at launching caused slow descent after pressure height was reached. Shows need of short appendix and automatic ballast valve.
16	6 Sept.1947 0828 LST	Alamogordo New Mexico	1 General Mills 20'.001 Polyethylene.2 appendix outside shroud lines	4.4kg	397mc Radiosonde Data gear Banner Ballast release	16.1kg	Automatic Ballast Release assembly	3.2kg	2.4kg	18.5kg	100%	Theodo-lite 100% SCR-658 100%	Not required A/c used to secure for gear	30 min.	None (burst)	Max.31700'	0% 6 miles MS Alamogordo AAF	Heavily loaded balloon with too much free lift (inflated by volume estimate in wind). High oscillations observed after release. Balloon burst due to blowing off top wall below pressure altitude. Balloon cause down with free falling gear but was not round.
17	9 Sept.1947 1647 MST	Alamogordo New Mexico	1 H.A. Smith 15'.004" Polyethylene with 18 load points	6.4kg	397mc Radiosonde Banner Ballast release	11.3kg	Automatic Ballast release assembly 100 gm/hr fixed leak	4.0kg	2.1kg	13.4kg	281 min.	281 min.	Not required night flight	estimated 10 hrs.	181 min.1500'	Max.29700' Const.29200'	Croft, Kansas 555 miles	Successful controlled altitude flight demonstrating altitude controls maintain height through a sunset. Balloon descended near Croft, Kansas long after passing out of Rewell's reception range. Need for a barograph shown.

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.