Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by GLM-OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 8 …Computer Specialist, Office of the Secretary of the Air Force, Pentagon; George Cully, Historian, 81st Training…
  • p. 20 …FOR THE SECRETARY OF THE AIR FORCE FROM: SAF/AAZ 1720 Air Force Pentagon Washington, DC…
  • p. 56 …SAF/FMPF, Room 4C228, Pentagon SUBJECT: Central Point of Contact, GAO Code 701034 2. You will…
  • p. 58 # DEPARTMENT OF THE AIR FORCE WASHINGTON DC 20330-1000 OFFICE OF THE SECRETARY MEMORANDUM FOR DISTRIBUTION…
  • p. 59 …SAF/AAZ 1720 Air Force Pentagon Washington DC 20330-1720 SUBJECT: GAO Review on Records Management…
  • p. 75 …HQ USAF/XOWP 1490 Air Force Pentagon Washington DC 20330-1490 SUBJECT: GAO Review on Records…
  • p. 77 10 March 1994 SAF/AAIQ 1610 Air Force Pentagon Washington, DC 20330-1610 MEMORANDUM FOR SAF…
  • p. 78 …They noted that the histories for the 509th Bomb Group and Wing for Roswell Army Air…
  • p. 145 …the Pentagon if he had a problem with that he could take it up with the…
  • p. 185 …Perhaps you have it from the Pentagon files already, from the AG files. ## Q: We have…
  • p. 246 …Following that, I spent more than three years on the Air Staff in the Pentagon. Q…
  • p. 268 …Force Pentagon Washington, DC 20330-1720 SUBJECT: Report of Findings on Balloon Research The following report…

Read from the scan by GLM-OCR; expect the odd misread word.

Ltr, Md37, to. CG, AEC, Subj: Research Operations in Alaska

c. Noated and lighted storage and workshop space for scientific equipment (approximately 400 sq. ft.).

d. Upper air meteorological data from the surface to maximum obtainable altitudes for establishing host conditions and evaluating host data.

o. Ground vehicles for transporting test crew and up to one ton of test equipment to recording stations, up to 50 miles from the base.

f. Storage of explosives, bombs and/or TNT demolition charges, is required conveniently available to the base and aircraft.

g. Six thousand (6000) pounds of tetratol (2-1/2 lb. demolition charges) or one hundred (100) each 100-1b. to 500-1b. bombs are required to carry out the experimental work.

4. It is requested that the Natcon Laboratories be granted permission to conduct the above outlined tests within the Terriroty of Alaska, preferably in the vicinity of Fairbanks, beginning between the dates of 15 October and 15 December 1947 for a period of six weeks. In addition, it is requested that the following clearances and authorities be established in connection with the carrying out of this work.

a. Permission to install and operate recording stations at convenient points between Fairbanks and Point Barrow.

b. Permission to drop airburst bombs over at least a 150 mile straight-line course from Fairbanks.

c. If airburst bombing is not possible or proves unsatisfactory, it will be necessary to obtain permission to detonate up to 500 lbs. of TNT on the ground within 50 miles of the operating base. A vehicle will be required for carrying up to 1000 lbs. of explosives, and the assistance of two Corps of Engineers or Ordnance Department enlisted personnel will be required in firing the charges.

d. Authority is required for these Laboratories to draw upon any available supply of explosives in Alaska, requirements as indicated in paragraph 3 (g). If explosives are unavailable in Alaska, these Laboratories will make arrangements for obtaining explosives within the United States and transporting them to the point of the text.

5. If overall approval is granted to conduct this work as outlined, it is requested that these Laboratories be notified immediately, even though detailed arrangements are incomplete, so that aircraft clearances and personnel orders may be initiated.

/ a / W. H. Congdon, Lt. Col., AC

D. P. GRAUL Colonel, Air Corps

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.