Documents / Report

The Roswell Report: Fact vs. Fiction in the New Mexico Desert

USAF / The Black Vault · 1995 · 882 pages · text by OCR

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published by Headquarters United States Air Force in 1995. The Black Vault distributes this copy. It reproduces the report by Col. Richard L. Weaver and the synopsis by 1st Lt. James McAndrew, both written after a General Accounting Office inquiry requested by Representative Steven Schiff. The Air Force search found no evidence of an extraterrestrial craft or crew. It concluded that the Roswell debris most likely came from NYU Flight No. 4, a Project MOGUL balloon train.

  • p. 193 …overhead and followed the balloons out to sea. I have no idea about the results that…
  • p. 200 …the regular 334 that we had at sea level. From that they could deduce the temperature…
  • p. 243 …actually located on the jurisdictional lines between Sea Girt and Springlake, New Jersey. It was an…
  • p. 244 …The Sea Girt Inn? A: Exactly. That's where John had his office, and I was…
  • p. 320 …alone is about 24,000 miles at sea level, and about 4500 miles at 45,000…
  • p. 325 …twenty-five (25) feet at their largest sea-level diameter. The sonic unit was a combination…
  • p. 378 …per hour when one-fifth inflated at sea level). One other type of balloon which has…
  • p. 402 …Let us, then, compare the rate of leakage at any given altitude with leakage at sea…
  • p. 404 …The leakage at any altitude may be expressed as a function of leakage at sea level…
  • p. 405 Comparing rate of leakage at 40,000 feet with leakage at sea level: $$ \frac {L _ {4…
  • p. 407 …If a 20-foot diameter balloon $ \frac{1}{1 0} $ full were tested at sea level…
  • p. 408 …At sea level this is equivalent to 5.32 gm/hr. for a 20-foot diameter…
  • p. 414 …Using the rules of subsonic aerodynamics, Picard suggests that air at sea level escaping at 1333…
  • p. 415 …air at sea level (lb./ft. $ ^{3} $ ) 14.7 = pressure of air at sea level (psi…
  • p. 432 …to about 20 millibars and increased to sea-level pressure at different temperatures. The most comprehensive…
  • p. 563 …The height above mean sea level as determined from pressure measurements used in this work with…
  • p. 644 …point at which the radiosonde reaches the sea surface. ## 2. Earlier attempts There have been numerous…
  • p. 645 …The balloons floated between the surface and 30,000 ft above sea level; those which reached…
  • p. 704 …Met Gifford who has 90' sea rescue boat this project is planning to use. Stayed at…
  • p. 719 …Worzel working on gravity at sea. Saw Geo Woollard and the Ryders. Woollard after Guggenheim fellowship…
  • p. 779 …the launching site is markedly different from sea level, a shift in this curve is needed…
  • p. 817 …balloon at all times with respect to sea level. On this curve also it is customary…
  • p. 825 …The height above mean sea level as determined from pressure measurements used in this work with…
Ltr, Md37, to. CG, AEC, Subj: Research Operations in Alaska

c. Noated and lighted storage and workshop space for scientific equipment (approximately 400 sq. ft.).

d. Upper air meteorological data from the surface to maximum obtainable altitudes for establishing host conditions and evaluating host data.

o. Ground vehicles for transporting test crew and up to one ton of test equipment to recording stations, up to 50 miles from the base.

f. Storage of explosives, bombs and/or TNT demolition charges, is required conveniently available to the base and aircraft.

g. Six thousand (6000) pounds of tetratol (2-1/2 lb. demolition charges) or one hundred (100) each 100-1b. to 500-1b. bombs are required to carry out the experimental work.

4. It is requested that the Natcon Laboratories be granted permission to conduct the above outlined tests within the Terriroty of Alaska, preferably in the vicinity of Fairbanks, beginning between the dates of 15 October and 15 December 1947 for a period of six weeks. In addition, it is requested that the following clearances and authorities be established in connection with the carrying out of this work.

a. Permission to install and operate recording stations at convenient points between Fairbanks and Point Barrow.

b. Permission to drop airburst bombs over at least a 150 mile straight-line course from Fairbanks.

c. If airburst bombing is not possible or proves unsatisfactory, it will be necessary to obtain permission to detonate up to 500 lbs. of TNT on the ground within 50 miles of the operating base. A vehicle will be required for carrying up to 1000 lbs. of explosives, and the assistance of two Corps of Engineers or Ordnance Department enlisted personnel will be required in firing the charges.

d. Authority is required for these Laboratories to draw upon any available supply of explosives in Alaska, requirements as indicated in paragraph 3 (g). If explosives are unavailable in Alaska, these Laboratories will make arrangements for obtaining explosives within the United States and transporting them to the point of the text.

5. If overall approval is granted to conduct this work as outlined, it is requested that these Laboratories be notified immediately, even though detailed arrangements are incomplete, so that aircraft clearances and personnel orders may be initiated.

/ a / W. H. Congdon, Lt. Col., AC

D. P. GRAUL Colonel, Air Corps

Cited by

Cases discussed

About this file

Report, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 882 pages are in the text index: search them above, or from the library's search.