Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 146 …3) 1941 1941 Pursuit P-38 Lightning Lockheed I937 '939 '940 P-39 Airacobra Bell '937…
  • p. 330 …those of Boeing in Seattle, Douglas and Lockheed in Los Angeles, and Consolidated in San Diego…
  • p. 375 …Atlantic Airways obtained the pilots from several sources, principally from the Lockheed Company on a loan…
  • p. 396 …Between June and the end of the year, 398 Lockheed and Martin medium bombers-including I…
  • p. 706 …T h e Lockheed Corporation for some time had operated an assembly plant for the British…
  • p. 707 …But Lockheed representatives began to survey the site and to draft detailed plans from late December…
  • p. 708 …r t o n ~ o o d . " ~Lockheed, also, was preparing in June to send some…
  • p. 723 …Burtonwood assumed increasing importance and some of Lockheed's civilian recruits went to work there on…
  • p. 815 …AAF to Lockheed Corp., 3 Jan. 1942; msg. #248, AGWAR to SPOBS, 28 Dec. 1941;msg…
  • p. 818 …Ogden of the Lockheed Aircraft Corporation, in- cluding Gen. Miller, Gen. Dunton, and Lt. Col. Short…
  • p. 852 …Sir Charles, 253 Little Staughton, 63 I Liverpool, 630, 635-38, 640 Lockheed aircraft plant, 280…
T H E E I G H T H A I R F O R C E
General Arnold. H e proposed that: ( I ) the AAF set up mobile repair
depots manned by civilians to service American aircraft operated by
the R A F in the United Kingdom; ( 2 ) the AAF ultimately take over
the management of existing British facilities for repair of American-
built equipment and provide for their expansion as required, using
initially civilian personnel; ( 3 ) specifically, and as quickly as possible,
Langford Lodge be established as a depot for third echelon main-
tenance; * and (4) if American air units should operate from bases
in the United Kingdom, the United States assume responsibility for
third echelon repair facilities for all U.S.-built planes operated by the
RAF and AAF, and for the supply of spare parts.'03
Because of the current shortage of U.S. personnel and equipment,
General Arnold refused to assume responsibility for the maintenance
of all RAF-operated American planes, but he approved, as a useful
step toward the development of an American service organization in
the United Kingdom, negotiations for the establishment of a depot
at Langford Lodge. It was anticipated that, after the President's
approval had been obtained, at least six months would be required to
provide necessary equipment and trained personnel, for it would be
unwise to rob newly expanding depot facilities in the United States
and, in addition, prior commitments to the Philippines and other
points would have to be fulfilled first. Meanwhile, General Arnold
desired that as far as possible American civilian personnel already in
the United Kingdom be used to man the
Plans for development of a depot at Langford Lodge proceeded on
the assumption that it could best be operated under contract with an
American aircraft company. T h e Lockheed Corporation for some
time had operated an assembly plant for the British near Liverpool,
and it was evidently felt that this company because of its experience
would be especially well equipped to undertake the pro ject.lo5 And
so, shortly after our entry into war the W a r Department requested
Lockheed to provide a maintenance depot for the AAF at Langford
Lodge. T h e actual contract with the Lockheed Overseas Corporation,
* In AAF usage, maintenance falls into four classifications, as follows: first echelon
maintenance covers repair and service that can be provided by the crew of the plane;
second echelon maintenance describes that provided by the ground crew forming
an integral part of the unit using the equipment; third echelon maintenance covers
work beyond the capacities of the using unit and is normally provided by more or
less mobile maintenance organizations; fourth echelon maintenance provides general
overhaul and reclamation involving the use of heavy tools and machinery in more
or less fixed installations.
63 5

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.