Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 173 …At the Roosevelt-Churchill conference at sea in mid-August, Generals Marshall and Arnold had made…
  • p. 226 …Air Service Command under Col. L.S. Churchill. Because of a shortage of experienced officers, only…
  • p. 282 …President Roosevelt and Prime Minister Churchill with their chiefs of staff, then meeting in Washington, had…
  • p. 287 …the arrival in Washington of Prime Minister Churchill, his chiefs of staff, and other high-ranking…
  • p. 290 …stipulated in ABC-I. A t Mr. Churchill’s request, U.S. troops were to relieve…
  • p. 302 …the U.S. forces, and by Mr. Churchill as British Prime Minister and Minister of Defense…
  • p. 303 …Field Marshal Sir John Dill representing Mr. Churchill as Minister of De- fense. Sir John Dill…
  • p. 304 …of such a personal representative of Mr. Churchill might make difficult the maintenance of normal military…
  • p. 425 …O n the same day, Prime Minister Churchill informed Gen. Sir Archibald Wavell of his selection…
  • p. 628 …Western Hemisphere. When the President and Mr. Churchill met with their military staffs in the ARCADIA…
  • p. 630 …strong support in a long cable from Churchill to Roosevelt, delivered on 5 March, in which…
  • p. 636 …first in a gen- eral meeting with Churchill, later among the airmen alone.34Arnold reviewed the…
  • p. 639 …Much had happened in the two months which had passed since Churchill had approved that plan…
  • p. 640 …Duncan, chief of staff for the Eighth Air Force, wrote from Washington to Spaatz that Churchill…
  • p. 641 …postponement was al- most tantamount to refusal. Churchill was back in London by the 27th. In…
  • p. 642 …then back in Washington, that Roosevelt and Churchill “believed” that T O R C H was…
  • p. 661 …Even during the Battle of Britain, Churchill could tell the House of Commons that “there seems…
  • p. 705 …4 1 . ~ ~The following month, Prime Minister Churchill in conference with Messrs. Harry Hopkins and Averell…
  • p. 810 …2 0 August 1940, in R.S. Churchill, ed., Into Battle (London, 1941),p. 2 5…
  • p. 811 …comp., Winston Churchill’s Secret Session Speeches (New York, 1946), p. 85. 161. Larner report, as…
  • p. 845 …L.S., 182 Churchill, Prime Minister Winston, 133, 1369 141, 232, 235-37, 2409 2431 252…
A I R T R A N S P O R T A N D F E R R Y I N G
the various installations by water transport and, to a limited extent,
by air. T h e transportation and storage of sufficient supplies of gasoline
alone constituted a logistical problem of considerable magnitude. Spare
parts for each type of aircraft to be ferried over the route had to be
stocked at each of the bases. With none of the stations was it possible
to maintain unhindered water communications a t all times. Goose
Bay was accessible by water only from early June to October. BW-8,
above the Arctic Circle, enjoyed a shipping season of surprising
length, being open about six months of the year. But the weather
station at CRYSTAL I11 could be reached by water for only about
six weeks of the late summer and early fall. Enemy submarines were
a constant menace along the shipping lanes, as were ice floes, heavy
fogs, and submerged reefs in uncharted areas.133
Principally because of the extreme shortage of transport aircraft,
only a limited number of personnel and a relatively small quantity of
supplies and equipment could be moved into the bases by air. But even
during the winter, the Ferrying Command was able to operate a small-
scale air transport service into Goose Bay in support of the con-
struction work. With a single C-39, the command began moving
contractor’s personnel and supplies from Moncton, New Brunswick,
to Goose Bay three days after Pearl Harbor.134In mid-February 1942,
this C-39 military service was replaced by a contract carrier service
operated by Northeast Airlines. Northeast maintained for some
months a regular service between Presque Isle and Goose Bay by way
of bases in Newfoundland and later extended its flights into Green-
land, Iceland, and Britain.135Before June, when the Eighth Air Force
began its air movement along the route, two other contract airlines
conducted survey flights and opened regular transport services over
the North Atlantic. Transcontinental & Western Air began to fly its
Stratoliners over the route in April, going all the way into Prest-
During the same month, American Airlines, under contract
to the Air Service Command, opened a service to Labrador, Baffin
Island, and G~een1and.l~’In the weeks immediately preceding the
start of the Eighth’s movement, the 60th Transport Group, a unit of
that air force equipped with C-47’s, gave considerable assistance in
moving supplies and men into the bases.‘38
Army Air Forces Headquarters, the Ferrying Command, and other
interested AAF agencies were able to. keep in touch with activities
at the bases by means of numerous survey flights sent out over the
3 47

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 863 pages are in the text index: search them above, or from the library's search.