This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 386 …More threatening were Rommel’s forces in North Africa, for the very existence of the air…
  • p. 387 …the route over which the Far East Air Force had received its thirty-five heavy bombers…
  • p. 551 …Formerly commander of the Far East Air Force in the Philip- * See above, pp. 396-97…
  • p. 561 …of an air force, depended upon a line of communications extending across the Indian and At…
  • p. 570 …the American air force would be used in the Bay of Bengal and Indian Ocean area…
  • p. 571 …Accordingly, on 24 May the order committing the Tenth Air Force to operations under RAF supervision…
  • p. 577 …involved in estab- lishing and operating an air force in Asia. The report of the Grady…
  • p. 630 …Policy for Disposition of US and British Air Forces.” l6 This memorandum greatly extended the scope…
  • p. 797 …MacArthur argued that now was a pro- pitious moment to rush forces from the Indian and…
  • p. 819 …5 8 - 6 7 Eighth Air Force, I, 326ff.; Achtung Indianer, a history of VIII FC…
  • p. 850 …See also CBI; Air Forces, Tenth AF. 336407 3537 356, 3803 395-96, q857 496 India…
T H E A R M Y A I R F O R C E S I N W O R L D W A R I1
strategic positions for observing the course of air masses moving down
from the Arctic regions of Canada. CRYSTAL I was located at Fort
Chimo, Labrador; CRYSTAL I1 at the head of Frobisher Bay, Baffin
Island; and CRYSTAL 111 on Padloping Island, jusr off the northeast
coast of Baffin Island.13"
Nine months of work had gone into the building of the far north-
em route by the time the United States became an active belligerent.
But more than six months of preparations on a much larger scale re-
mained before the route would be ready to support heavy movements
of aircraft to Europe. During the winter months that followed Pearl
Harbor very little progress could be made, especially in the building
or extension of permanent runways and parking aprons. More favor-
able weather in the spring of 1942 permitted the speed-up of con-
struction activities at all points along the route, but a t the same time
it brought its own additional problems. At Goose Bay the compacted
snow runways, satisfactory enough during the winter, began to soften
with the spring thaw, necessitating a heavy covering of gravel. By
June, one rolled gravel runway 6,000 feet long was ready and two
others were under construction. Because the housing, messing, main-
tenance, and other facilities provided by the Canadian government
a t Goose Bay were inadequate for anticipated needs, the United
States requested and secured authority in the summer to construct
an entirely separate establishment, complete in every respect, on the
opposite side of the airdrome from the RCAF ~ t a t i 0 n . l ~ ~At BLUIE
W E S T I there had been completed by June one steel mat runway
5,000 feet long and another was under construction, while BW-8
had one good 5,000-foot gravel and clay landing strip. The Reykjavik
airport in Iceland had three concrete runways, but two of these were
capable of accommodating only the lighter types of airplanes and the
third was less than 4,700 feet in length. Neither of the two American
bases under construction in Iceland-Meeks and Patterson fields near
Keflavik-was usable during I 942.American air force personnel were
concentrated at the RAF base a t Reykjavik, occupying facilities on
the opposite side of the field from the British. The Presnvick airdrome
in Scotland, having one concrete runway 6,600 feet long, was well
equipped as a terminal
While construction work proceeded during the spring and summer,
thousands of tons of supplies, including building materials, snow re-
moval equipment, gasoline, food, and aircraft parts were moving into
346

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.