This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 173 …At the Roosevelt-Churchill conference at sea in mid-August, Generals Marshall and Arnold had made…
  • p. 226 …Air Service Command under Col. L.S. Churchill. Because of a shortage of experienced officers, only…
  • p. 282 …President Roosevelt and Prime Minister Churchill with their chiefs of staff, then meeting in Washington, had…
  • p. 287 …the arrival in Washington of Prime Minister Churchill, his chiefs of staff, and other high-ranking…
  • p. 290 …stipulated in ABC-I. A t Mr. Churchill’s request, U.S. troops were to relieve…
  • p. 302 …the U.S. forces, and by Mr. Churchill as British Prime Minister and Minister of Defense…
  • p. 303 …Field Marshal Sir John Dill representing Mr. Churchill as Minister of De- fense. Sir John Dill…
  • p. 304 …of such a personal representative of Mr. Churchill might make difficult the maintenance of normal military…
  • p. 425 …O n the same day, Prime Minister Churchill informed Gen. Sir Archibald Wavell of his selection…
  • p. 628 …Western Hemisphere. When the President and Mr. Churchill met with their military staffs in the ARCADIA…
  • p. 630 …strong support in a long cable from Churchill to Roosevelt, delivered on 5 March, in which…
  • p. 636 …first in a gen- eral meeting with Churchill, later among the airmen alone.34Arnold reviewed the…
  • p. 639 …Much had happened in the two months which had passed since Churchill had approved that plan…
  • p. 640 …Duncan, chief of staff for the Eighth Air Force, wrote from Washington to Spaatz that Churchill…
  • p. 641 …postponement was al- most tantamount to refusal. Churchill was back in London by the 27th. In…
  • p. 642 …then back in Washington, that Roosevelt and Churchill “believed” that T O R C H was…
  • p. 661 …Even during the Battle of Britain, Churchill could tell the House of Commons that “there seems…
  • p. 705 …4 1 . ~ ~The following month, Prime Minister Churchill in conference with Messrs. Harry Hopkins and Averell…
  • p. 810 …2 0 August 1940, in R.S. Churchill, ed., Into Battle (London, 1941),p. 2 5…
  • p. 811 …comp., Winston Churchill’s Secret Session Speeches (New York, 1946), p. 85. 161. Larner report, as…
  • p. 845 …L.S., 182 Churchill, Prime Minister Winston, 133, 1369 141, 232, 235-37, 2409 2431 252…
T H E A R M Y A I R F O R C E S I N W O R L D W A R I1
strategic positions for observing the course of air masses moving down
from the Arctic regions of Canada. CRYSTAL I was located at Fort
Chimo, Labrador; CRYSTAL I1 at the head of Frobisher Bay, Baffin
Island; and CRYSTAL 111 on Padloping Island, jusr off the northeast
coast of Baffin Island.13"
Nine months of work had gone into the building of the far north-
em route by the time the United States became an active belligerent.
But more than six months of preparations on a much larger scale re-
mained before the route would be ready to support heavy movements
of aircraft to Europe. During the winter months that followed Pearl
Harbor very little progress could be made, especially in the building
or extension of permanent runways and parking aprons. More favor-
able weather in the spring of 1942 permitted the speed-up of con-
struction activities at all points along the route, but a t the same time
it brought its own additional problems. At Goose Bay the compacted
snow runways, satisfactory enough during the winter, began to soften
with the spring thaw, necessitating a heavy covering of gravel. By
June, one rolled gravel runway 6,000 feet long was ready and two
others were under construction. Because the housing, messing, main-
tenance, and other facilities provided by the Canadian government
a t Goose Bay were inadequate for anticipated needs, the United
States requested and secured authority in the summer to construct
an entirely separate establishment, complete in every respect, on the
opposite side of the airdrome from the RCAF ~ t a t i 0 n . l ~ ~At BLUIE
W E S T I there had been completed by June one steel mat runway
5,000 feet long and another was under construction, while BW-8
had one good 5,000-foot gravel and clay landing strip. The Reykjavik
airport in Iceland had three concrete runways, but two of these were
capable of accommodating only the lighter types of airplanes and the
third was less than 4,700 feet in length. Neither of the two American
bases under construction in Iceland-Meeks and Patterson fields near
Keflavik-was usable during I 942.American air force personnel were
concentrated at the RAF base a t Reykjavik, occupying facilities on
the opposite side of the field from the British. The Presnvick airdrome
in Scotland, having one concrete runway 6,600 feet long, was well
equipped as a terminal
While construction work proceeded during the spring and summer,
thousands of tons of supplies, including building materials, snow re-
moval equipment, gasoline, food, and aircraft parts were moving into
346

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 863 pages are in the text index: search them above, or from the library's search.