Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 370 …Reichers took a route by way of Cairo across central Africa, the South Atlantic, and up…
  • p. 371 …I 0,000 miles separated Miami from Cairo.23An airplane leaving southern Florida traveled 4,000…
  • p. 372 …of Africa and across central Africa to Cairo. Ferrying operations over the South Atlantic route had…
  • p. 375 …Takoradi following the completion of deliveries to Cairo, and for hauling critical items of supply east…
  • p. 378 …7 December the service was extended to Cairo and beyond.54 Before operations could begin, Pan…
  • p. 379 …Maxwell had been established at Cairo on I 3 September 1941, with responsibilities similar to those…
  • p. 380 …to the opening of a service to Cairo over the South Atlantic route. Two survey flights…
  • p. 381 …R Y I N G Washington for Cairo prior to 7 December, each carrying important military…
  • p. 382 …of the bombers departed Bolling Field for Cairo on 20 November. Unfortunately, on the trip across…
  • p. 385 …Lend-lease planes for Russia were flown through Cairo to Basra or to Tehran, where they…
  • p. 387 …for ferrying up the old Cape-to-Cairo airway. Although more exposed to attack, Takoradi and…
  • p. 388 …Tampa-Trinidad- Belem-Natal-Accra-Khartoum-Cairo-Habbaniya-Karachi.At Karachi the LB-3o’s under…
  • p. 390 …24 shuttle services to Great Britain and Cairo. The first step was to establish a ferrying…
  • p. 391 …parts stocked by the RAF a t Cairo, all spare parts had to be shipped from…
  • p. 395 …assembled and then ferried across Africa to Cairo. Within a few months after Pearl Harbor, the…
  • p. 407 …Harbor, first to Britain and later to Cairo, had been little more than courier services and…
  • p. 411 …from their normal operations between Washington and Cairo and sent to the Far East. A plan…
  • p. 412 …Kester-the pilot who had inaugurated the Washington- Cairo transport service in November-was lost off…
  • p. 413 …In February, Transcontinental & Western Air began operating a shuttle service from Washington to Cairo, using two…
  • p. 629 …5) MAGNET (Northern Ireland); (6) Task Force CAIRO (to Egypt).g On 2 7 January the…
  • p. 630 …one group of heavies set up for CAIRO was to go out only after the initial…
  • p. 778 …CM-IN, MA Cairo to M E I D 65. CM-IN, London (Brett) to Trip…
  • p. 779 …1942; CM- IN, Cairo (Fellen) to T A G (Adler for Arnold), 8754 Amseg, 3 Feb…
  • p. 786 …1942; msg. $762, Cairo to T A G , 4 Feb. IWZ; msg. #13, Brett to T…
  • p. 830 …BOLERO BR CAA C/AAF C/AC CAIRO C/AS C A T F CCRC CCS…
  • p. 844 …5 Cagayan (Mindanao), 219 Cagayan Valley, 208 Cairo, 3 1 ~ 2 1 , 325-26, 328-29…
T H E A R M Y A I R F O R C E S I N W O R L D W A R I1
strategic positions for observing the course of air masses moving down
from the Arctic regions of Canada. CRYSTAL I was located at Fort
Chimo, Labrador; CRYSTAL I1 at the head of Frobisher Bay, Baffin
Island; and CRYSTAL 111 on Padloping Island, jusr off the northeast
coast of Baffin Island.13"
Nine months of work had gone into the building of the far north-
em route by the time the United States became an active belligerent.
But more than six months of preparations on a much larger scale re-
mained before the route would be ready to support heavy movements
of aircraft to Europe. During the winter months that followed Pearl
Harbor very little progress could be made, especially in the building
or extension of permanent runways and parking aprons. More favor-
able weather in the spring of 1942 permitted the speed-up of con-
struction activities at all points along the route, but a t the same time
it brought its own additional problems. At Goose Bay the compacted
snow runways, satisfactory enough during the winter, began to soften
with the spring thaw, necessitating a heavy covering of gravel. By
June, one rolled gravel runway 6,000 feet long was ready and two
others were under construction. Because the housing, messing, main-
tenance, and other facilities provided by the Canadian government
a t Goose Bay were inadequate for anticipated needs, the United
States requested and secured authority in the summer to construct
an entirely separate establishment, complete in every respect, on the
opposite side of the airdrome from the RCAF ~ t a t i 0 n . l ~ ~At BLUIE
W E S T I there had been completed by June one steel mat runway
5,000 feet long and another was under construction, while BW-8
had one good 5,000-foot gravel and clay landing strip. The Reykjavik
airport in Iceland had three concrete runways, but two of these were
capable of accommodating only the lighter types of airplanes and the
third was less than 4,700 feet in length. Neither of the two American
bases under construction in Iceland-Meeks and Patterson fields near
Keflavik-was usable during I 942.American air force personnel were
concentrated at the RAF base a t Reykjavik, occupying facilities on
the opposite side of the field from the British. The Presnvick airdrome
in Scotland, having one concrete runway 6,600 feet long, was well
equipped as a terminal
While construction work proceeded during the spring and summer,
thousands of tons of supplies, including building materials, snow re-
moval equipment, gasoline, food, and aircraft parts were moving into
346

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.