Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 146 …3) 1941 1941 Pursuit P-38 Lightning Lockheed I937 '939 '940 P-39 Airacobra Bell '937…
  • p. 330 …those of Boeing in Seattle, Douglas and Lockheed in Los Angeles, and Consolidated in San Diego…
  • p. 375 …Atlantic Airways obtained the pilots from several sources, principally from the Lockheed Company on a loan…
  • p. 396 …Between June and the end of the year, 398 Lockheed and Martin medium bombers-including I…
  • p. 706 …T h e Lockheed Corporation for some time had operated an assembly plant for the British…
  • p. 707 …But Lockheed representatives began to survey the site and to draft detailed plans from late December…
  • p. 708 …r t o n ~ o o d . " ~Lockheed, also, was preparing in June to send some…
  • p. 723 …Burtonwood assumed increasing importance and some of Lockheed's civilian recruits went to work there on…
  • p. 815 …AAF to Lockheed Corp., 3 Jan. 1942; msg. #248, AGWAR to SPOBS, 28 Dec. 1941;msg…
  • p. 818 …Ogden of the Lockheed Aircraft Corporation, in- cluding Gen. Miller, Gen. Dunton, and Lt. Col. Short…
  • p. 852 …Sir Charles, 253 Little Staughton, 63 I Liverpool, 630, 635-38, 640 Lockheed aircraft plant, 280…
A I R T R A N S P O R T A N D F E R R Y I N G
land and thence to Iceland and to Britain.'l3 Such a route would have
required the construction of only one base in addition to those already
in use-the one in Greenland. But after the United States became an
active participant in the undertaking, and when the Lend-Lease Act
raised the prospect of a greatly increased volume of traffic, the project
was altered and expanded. Several factors made the field at Gander
Lake a very unsatisfactory staging point. Traffic moving through the
base and directly across the Atlantic to Scotland was already heavier
than could be well a c c ~ m m o d a t e d . ' ~ ~T h e airport lay considerably to
the east of a direct line of flight from embarkation points in Maine
or eastern Canada to southern Greenland. Moreover, weather condi-
tions in Newfoundland were much worse than in the mainland region
of Labrador, which enjoyed a better location on the line of flight to
G~een1and.I'~Accordingly, a site for development was selected at
Goose Bay in Labrador; and Canada having undertaken the respon-
sibility for construction of airdrome facilities, the work was begun
there in September 1941.T h e first airplane landed on one of the
temporary snow-packed runways two days after Pearl Harb0r.l''
T h e primary responsibility for development of needed facilities in
Greenland fell to the United States under the terms of the Danish-
American agreement of 9 April 1941.' ''' Steps toward completing
preliminary surveys had already been taken, and early in July of that
year an advance task force of engineer, coast artillery, and general
service troops arrived in the waters of southern Greenland and pro-
ceeded up the Tunugdliarfik Fjord to Narsarssuak, a site previously
selected for the major staging base between Labrador and Iceland.
Construction of a landing field and other base facilities began at once,
and with the help of reinforcements that followed, continued on
through the winter.*'' T h e Narsarssuak base, which was given the
code name of BLUIE WEST I (BW-I), was ideally located about
midway between Goose Bay and Reykjavik, Iceland, lying approxi-
mately 775 miles from each. These relatively short hops from the
continent to Iceland and the one from Iceland to Scotland would
make it possible to move even fighter aircraft along the route without
too great difficulty.
Work on a second air base in Greenland, located farther north on
the west coast just above the Arctic Circle and to be known as
BLUIE WEST 8 (BW-8), began in late September 1941."~Plans
+ See above, p. IZZ.
343

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.