Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 370 …Reichers took a route by way of Cairo across central Africa, the South Atlantic, and up…
  • p. 371 …I 0,000 miles separated Miami from Cairo.23An airplane leaving southern Florida traveled 4,000…
  • p. 372 …of Africa and across central Africa to Cairo. Ferrying operations over the South Atlantic route had…
  • p. 375 …Takoradi following the completion of deliveries to Cairo, and for hauling critical items of supply east…
  • p. 378 …7 December the service was extended to Cairo and beyond.54 Before operations could begin, Pan…
  • p. 379 …Maxwell had been established at Cairo on I 3 September 1941, with responsibilities similar to those…
  • p. 380 …to the opening of a service to Cairo over the South Atlantic route. Two survey flights…
  • p. 381 …R Y I N G Washington for Cairo prior to 7 December, each carrying important military…
  • p. 382 …of the bombers departed Bolling Field for Cairo on 20 November. Unfortunately, on the trip across…
  • p. 385 …Lend-lease planes for Russia were flown through Cairo to Basra or to Tehran, where they…
  • p. 387 …for ferrying up the old Cape-to-Cairo airway. Although more exposed to attack, Takoradi and…
  • p. 388 …Tampa-Trinidad- Belem-Natal-Accra-Khartoum-Cairo-Habbaniya-Karachi.At Karachi the LB-3o’s under…
  • p. 390 …24 shuttle services to Great Britain and Cairo. The first step was to establish a ferrying…
  • p. 391 …parts stocked by the RAF a t Cairo, all spare parts had to be shipped from…
  • p. 395 …assembled and then ferried across Africa to Cairo. Within a few months after Pearl Harbor, the…
  • p. 407 …Harbor, first to Britain and later to Cairo, had been little more than courier services and…
  • p. 411 …from their normal operations between Washington and Cairo and sent to the Far East. A plan…
  • p. 412 …Kester-the pilot who had inaugurated the Washington- Cairo transport service in November-was lost off…
  • p. 413 …In February, Transcontinental & Western Air began operating a shuttle service from Washington to Cairo, using two…
  • p. 629 …5) MAGNET (Northern Ireland); (6) Task Force CAIRO (to Egypt).g On 2 7 January the…
  • p. 630 …one group of heavies set up for CAIRO was to go out only after the initial…
  • p. 778 …CM-IN, MA Cairo to M E I D 65. CM-IN, London (Brett) to Trip…
  • p. 779 …1942; CM- IN, Cairo (Fellen) to T A G (Adler for Arnold), 8754 Amseg, 3 Feb…
  • p. 786 …1942; msg. $762, Cairo to T A G , 4 Feb. IWZ; msg. #13, Brett to T…
  • p. 830 …BOLERO BR CAA C/AAF C/AC CAIRO C/AS C A T F CCRC CCS…
  • p. 844 …5 Cagayan (Mindanao), 219 Cagayan Valley, 208 Cairo, 3 1 ~ 2 1 , 325-26, 328-29…
A I R T R A N S P O R T A N D F E R R Y I N G
Life Line to the Middle and Far East
Ferried aircraft departing from southern Florida bases for flight
over the southeastern route stopped first either a t Borinquen Field,
Puerto Rico, or a t one of the bases on the island of Trinidad. Piarco
Field on Trinidad, a Pan American base, was used for some months
after Pearl Harbor or until Waller Field, a purely military installa-
tion, was opened for traffic in February 1942. The Waller Field site
had been secured from the British in the destroyer-base lease agree-
ment, as was the site for Atkinson Field in British Guiana, the next
major staging base to the south. From Waller Field or Atkinson Field
aircraft were usually ferried to the base at Belem in northern Brazil
and thence to Natal on the Brazilian bulge, although some use was
made of alternate landing fields along the way. The two bases a t
Belem and Natal, built with airport development program funds by
the Pan American organization, were opened for traffic shortly after
Pearl Harbor. Prior to the opening of the base on Ascension Island
in July 1942, nearly all two-engine aircraft taking off from Natal for
flight over the South Atlantic landed at either Hastings Field in Sierra
Leone or Roberts Field in Liberia, each a t a distance of approximately
1,900 statute miles from Natal. Four-engine aircraft were able to fly
direct to Accra, but many stopped first at Hastings or Roberts fields
for refueling. From Accra aircraft moved in easy stages across the
central African route to Khartoum, and here the route divided. India-
bound planes were sent either across southern Arabia by way of
Aden to Karachi or up through Cairo, Habbaniya, and Basra to the
Karachi gateway. Lend-lease planes for Russia were flown through
Cairo to Basra or to Tehran, where they were turned over to Soviet
flyers. Aircraft bound for China crossed central India to Dinjan in
Assam and were flown over the Himalayas to K ~ n m i n g . ~ ~
A month or more before the United States entered the war and in
anticipation of an increasing flow of lend-lease aircraft to the Middle
East, the Ferrying Command had taken steps to place its own control
officers a t key bases on the southeastern route as far as Cairo. None
of these had reached his post prior to 7 December, but with the com-
ing of the war and the selection of the route for the ferrying of heavy
bombers to the Far East, the procurement and assignment of these
officers, as well as weather and communications officers and enlisted
specialists, was speeded up. The control officers became responsible
3 2 9

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.