Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 303 …of Naval Opera- tions; Adm. Ernest J. King, Commander in Chief, U.S. Fleet; Gen. George…
  • p. 316 …So far as the Navy is concerned, Admiral King, as you know, is not only Chief…
  • p. 493 …Admiral King believed that the mines offered a tempting bait to the Japanese who were currently…
  • p. 526 …Hence Admiral King placed a bid for suffi- 461
  • p. 527 …t this stage of the war Admiral King had accepted the belief that his carrier planes…
  • p. 538 …plan by 2 9 June, when Admiral King submitted to the Joint Chiefs a proposal that…
  • p. 607 …type * O n 5 March 1942, Admiral King wrote to General Arnold as follows: “The experience…
  • p. 608 …s.’l A formal request by Admiral King to the Chief of the Army Air Forces…
  • p. 609 …In a letter of 9 March 1942 to Admiral King, he proposed “the estab- lishment of…
  • p. 614 …In June, Admiral King expressed the official Navy position on this point with the utmost clarity…
  • p. 615 …In a memorandum to Admiral King, General McNarney, Deputy Chief of Staff, on 26 May outlined…
  • p. 616 …viewed as a temporary deta~hment.?~ Admiral King’s reaction to these cautious proposals was expressed…
  • p. 618 …the same words as used by Admiral King a month earlier: the answer to the antisubmarine…
  • p. 621 …On 14 September, General Marshall wrote to Admiral King: “Experience with the First Bomber Command in…
  • p. 622 …T o General Marshall’s proposal of 14 September, Admiral King had replied that, although he…
  • p. 641 …54 A week later General Marshall, Admiral King, Harry Hopkins, and a small staff flew to…
  • p. 645 …that scheduled to operate from the United King- dom. Dry topic or no, organization must figure…
  • p. 684 …the principal air task in the United King- dom had long been conceived as strategic bombardment…
  • p. 707 …establishment of base depots in the United King- dom became the basis of action in January…
  • p. 724 …Implicit in all of the arrangements being made in the United King- dom was the belief…
  • p. 788 …Force, Pt. I ; Fleet Adm. Ernest J. King, First Official Report to the Secretary of the…
  • p. 793 …Memo for Adm, King from C/S, 17 Mar. 1 % ~ . 34. JPS 2I/j/D, 7…
  • p. 795 …4 Aug. 1942. 108. Zbid. 109. Adm. King’s Report on Battle of Midway, incl. in…
  • p. 797 …306, 29 June 1942; memos for Adm. King from Mar- shall, 26 June 1942, and for…
  • p. 802 …1942; CM-IN-0629, Chung- king to AGWAR, # # z , 3 Apr. 1942; memo for Gen. Arnold…
  • p. 805 …Ltr., Arnold to King, 2 5 Feb. 1942. certain evidence from all Allied and enemy sources…
  • p. 806 …Memo for King from McNarney, 26 May 1942. 7 1 . Ltr., King to Marshall, 10 June…
  • p. 807 …Ltr., Marshall to King, 14 Sept. 1942, TAB XIVA, in Bowles report; memo for C G…
  • p. 808 …to notes from Mar- shall and Adm. King). 3 2 . A I c m o for…
  • p. 814 …Forces to the United King- dom, App. A, 19 Aug. 1942. 50. Ltr., Col. H.L…
  • p. 851 …C.E., 48-50 Killin, Pfc, 219 Kilner Board, 1 2 0 Kimbolton, 63 I King…
  • p. 854 …in Chief, 515, 5 2 2 , 544. (see also King); controversy over air power vs. battleship…
T H E A R M Y A I R F O R C E S I N W O R L D W A R I 1
plane mechanics in the labor market, the company found it necessary
also to set up organized courses of instruction in all types of airplane
maintenance and mechanical
Pan American Air Ferries actually delivered only a dozen aircraft
prior to Pearl Harbor, and all of these were transports for use on the
transAfrican run.48After the United States entered the war, deliv-
eries by PAAF pilots increased month by month. By the time the
personnel and facilities of the organization were militarized a t the
end of 1942, some 464 planes had been delivered over the South
Atlantic to the Middle East and the Far East by PAAF crews4’
In order to establish the flying boat service to West Africa, the
United States purchased for the sum of $900,000 one of Pan Amer-
ican’s famous four-engine Clippers, a Boeing B-3 14A withdrawn
from the Pacific. It was then leased to the contractor for the nominal
fee of one dollar.50The plane accommodated a crew of eleven and
sixty-eight day passengers or thirty-six sleeping passengers, with mail
and cargo holds having a total capacity of approximately five
Only one trip over the route, a survey flight, was made before 7
December.52 Soon after the United States entered the war, the
Clipper fleet was increased and a regular service was established over
the route: Miami-San Juan (Puerto Rico) -Port of Spain (Trinidad) -
Belem-Natal-Fisherman’s Lake (Liberia) -Lagos (Nigeria), with occa-
sional trips as far as Leopoldville (Belgian Congo) .53
Perhaps the most important link in the whole system of Pan Amer-
ican ferrying and transport services was the operation across central
Africa. In providing a transport service and in maintaining the bases,
Pan American Airways-Africa supported the movement across the
continent of aircraft arriving from both the United States and Great
Britain. Terminal points were established by terms of the contract
a t Bathurst on the west coast and a t Khartoum in eastern Africa,
but after 7 December the service was extended to Cairo and beyond.54
Before operations could begin, Pan American was faced with the
problem of assembling in the United States an administrative staff,
employing some hundreds of technicians, recruiting and training the
pilots, and transporting all of these, together with tons of material,
a third of the way around the world to Africa. The headquarters was
established a t the main base a t Accra on 8 October 1941. This step
was followed by the gradual taking over of other bases on the route
during October, November, and December as additional personnel
3 24

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 863 pages are in the text index: search them above, or from the library's search.