Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 173 …At the Roosevelt-Churchill conference at sea in mid-August, Generals Marshall and Arnold had made…
  • p. 226 …Air Service Command under Col. L.S. Churchill. Because of a shortage of experienced officers, only…
  • p. 282 …President Roosevelt and Prime Minister Churchill with their chiefs of staff, then meeting in Washington, had…
  • p. 287 …the arrival in Washington of Prime Minister Churchill, his chiefs of staff, and other high-ranking…
  • p. 290 …stipulated in ABC-I. A t Mr. Churchill’s request, U.S. troops were to relieve…
  • p. 302 …the U.S. forces, and by Mr. Churchill as British Prime Minister and Minister of Defense…
  • p. 303 …Field Marshal Sir John Dill representing Mr. Churchill as Minister of De- fense. Sir John Dill…
  • p. 304 …of such a personal representative of Mr. Churchill might make difficult the maintenance of normal military…
  • p. 425 …O n the same day, Prime Minister Churchill informed Gen. Sir Archibald Wavell of his selection…
  • p. 628 …Western Hemisphere. When the President and Mr. Churchill met with their military staffs in the ARCADIA…
  • p. 630 …strong support in a long cable from Churchill to Roosevelt, delivered on 5 March, in which…
  • p. 636 …first in a gen- eral meeting with Churchill, later among the airmen alone.34Arnold reviewed the…
  • p. 639 …Much had happened in the two months which had passed since Churchill had approved that plan…
  • p. 640 …Duncan, chief of staff for the Eighth Air Force, wrote from Washington to Spaatz that Churchill…
  • p. 641 …postponement was al- most tantamount to refusal. Churchill was back in London by the 27th. In…
  • p. 642 …then back in Washington, that Roosevelt and Churchill “believed” that T O R C H was…
  • p. 661 …Even during the Battle of Britain, Churchill could tell the House of Commons that “there seems…
  • p. 705 …4 1 . ~ ~The following month, Prime Minister Churchill in conference with Messrs. Harry Hopkins and Averell…
  • p. 810 …2 0 August 1940, in R.S. Churchill, ed., Into Battle (London, 1941),p. 2 5…
  • p. 811 …comp., Winston Churchill’s Secret Session Speeches (New York, 1946), p. 85. 161. Larner report, as…
  • p. 845 …L.S., 182 Churchill, Prime Minister Winston, 133, 1369 141, 232, 235-37, 2409 2431 252…
T H E A R M Y A I R F O R C E S I N W O R L D W A R I 1
plane mechanics in the labor market, the company found it necessary
also to set up organized courses of instruction in all types of airplane
maintenance and mechanical
Pan American Air Ferries actually delivered only a dozen aircraft
prior to Pearl Harbor, and all of these were transports for use on the
transAfrican run.48After the United States entered the war, deliv-
eries by PAAF pilots increased month by month. By the time the
personnel and facilities of the organization were militarized a t the
end of 1942, some 464 planes had been delivered over the South
Atlantic to the Middle East and the Far East by PAAF crews4’
In order to establish the flying boat service to West Africa, the
United States purchased for the sum of $900,000 one of Pan Amer-
ican’s famous four-engine Clippers, a Boeing B-3 14A withdrawn
from the Pacific. It was then leased to the contractor for the nominal
fee of one dollar.50The plane accommodated a crew of eleven and
sixty-eight day passengers or thirty-six sleeping passengers, with mail
and cargo holds having a total capacity of approximately five
Only one trip over the route, a survey flight, was made before 7
December.52 Soon after the United States entered the war, the
Clipper fleet was increased and a regular service was established over
the route: Miami-San Juan (Puerto Rico) -Port of Spain (Trinidad) -
Belem-Natal-Fisherman’s Lake (Liberia) -Lagos (Nigeria), with occa-
sional trips as far as Leopoldville (Belgian Congo) .53
Perhaps the most important link in the whole system of Pan Amer-
ican ferrying and transport services was the operation across central
Africa. In providing a transport service and in maintaining the bases,
Pan American Airways-Africa supported the movement across the
continent of aircraft arriving from both the United States and Great
Britain. Terminal points were established by terms of the contract
a t Bathurst on the west coast and a t Khartoum in eastern Africa,
but after 7 December the service was extended to Cairo and beyond.54
Before operations could begin, Pan American was faced with the
problem of assembling in the United States an administrative staff,
employing some hundreds of technicians, recruiting and training the
pilots, and transporting all of these, together with tons of material,
a third of the way around the world to Africa. The headquarters was
established a t the main base a t Accra on 8 October 1941. This step
was followed by the gradual taking over of other bases on the route
during October, November, and December as additional personnel
3 24

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. 863 pages are in the text index: search them above, or from the library's search.