Documents / Document

The Army Air Forces in World War II, Vol. 1 (archived PDF)

Air Force Historical Studies Office · 863 pages · text from the file's own layer

This is Volume One of The Army Air Forces in World War II, titled Plans and Early Operations, January 1939 to August 1942, edited by Wesley Frank Craven and James Lea Cate. The University of Chicago Press first published it in 1948, and the Office of Air Force History reprinted it in 1983. The front matter explains how the AAF historical program was set up during the war. The index covers Pacific, Atlantic and European operations, and nothing in the text concerns unidentified aerial phenomena.

  • p. 173 …At the Roosevelt-Churchill conference at sea in mid-August, Generals Marshall and Arnold had made…
  • p. 226 …Air Service Command under Col. L.S. Churchill. Because of a shortage of experienced officers, only…
  • p. 282 …President Roosevelt and Prime Minister Churchill with their chiefs of staff, then meeting in Washington, had…
  • p. 287 …the arrival in Washington of Prime Minister Churchill, his chiefs of staff, and other high-ranking…
  • p. 290 …stipulated in ABC-I. A t Mr. Churchill’s request, U.S. troops were to relieve…
  • p. 302 …the U.S. forces, and by Mr. Churchill as British Prime Minister and Minister of Defense…
  • p. 303 …Field Marshal Sir John Dill representing Mr. Churchill as Minister of De- fense. Sir John Dill…
  • p. 304 …of such a personal representative of Mr. Churchill might make difficult the maintenance of normal military…
  • p. 425 …O n the same day, Prime Minister Churchill informed Gen. Sir Archibald Wavell of his selection…
  • p. 628 …Western Hemisphere. When the President and Mr. Churchill met with their military staffs in the ARCADIA…
  • p. 630 …strong support in a long cable from Churchill to Roosevelt, delivered on 5 March, in which…
  • p. 636 …first in a gen- eral meeting with Churchill, later among the airmen alone.34Arnold reviewed the…
  • p. 639 …Much had happened in the two months which had passed since Churchill had approved that plan…
  • p. 640 …Duncan, chief of staff for the Eighth Air Force, wrote from Washington to Spaatz that Churchill…
  • p. 641 …postponement was al- most tantamount to refusal. Churchill was back in London by the 27th. In…
  • p. 642 …then back in Washington, that Roosevelt and Churchill “believed” that T O R C H was…
  • p. 661 …Even during the Battle of Britain, Churchill could tell the House of Commons that “there seems…
  • p. 705 …4 1 . ~ ~The following month, Prime Minister Churchill in conference with Messrs. Harry Hopkins and Averell…
  • p. 810 …2 0 August 1940, in R.S. Churchill, ed., Into Battle (London, 1941),p. 2 5…
  • p. 811 …comp., Winston Churchill’s Secret Session Speeches (New York, 1946), p. 85. 161. Larner report, as…
  • p. 845 …L.S., 182 Churchill, Prime Minister Winston, 133, 1369 141, 232, 235-37, 2409 2431 252…
D E P L O Y M E N T O N T H E E V E O F H O S T I L I T I E S
mum facilities on Christmas and Canton islands, as well as in the Fiji
Islands, New Caledonia, and Australia, by I 5 January I 942.* It devel-
oped that the Navy could not offer assistance in construction until
after completion of its own projects; the Hawaiian Department there-
fore was dependent upon whatever shipping and construction forces
the Army could provide.
Results of initial investigations showed that at least one 5,000-foot
runway in the direction of the prevailing wind could be prepared by
1 5 January 1942 at four sites: Christmas, Canton, Suva in the Fiji
Islands, and Townsville on the east coast of Australia. By the first week
in November the required diplomatic clearances had been received,
along with assurances of co-operation from the several governments.
In New Caledonia, where Australian forces were making defense
preparations with the permission of the Free French, representatives
of the Hawaiian Department negotiated with Australian authorities
for improvement of airfields which could be used on the South Pacific
route. This action resulted in provision of the necessary staging point
between the Fiji Islands and the continent of Australia. Responsibility
for development of the route from Australia to the Philippines was
vested on 2 7 October in the commanding general of U.S. Army Forces
in the Far East. General MacArthur had already initiated surveys of
air facilities along that portion of the route and had established con-
tacts with the senior British and Netherlands East Indies authorities.
T h e Hawaiian Department commander continued to direct the devel-
opment of the ferry route east of Australia. Chartering all the available
tugs and barges in the vicinity of Oahu, Army engineers moved con-
struction equipment, personnel, and their own water supply to Canton
and Christmas, while the Hawaiian Department secured the services
of a commercial engineering company for other points along the route.
N e w Zealand officials, who had agreed to improve an airfield at Nandi
in the Fiji Islands, made available all the equipment they could gather
for the
Pending completion of the South Pacific route, heavy bombers
destined for the Philippines continued to use the route via Midway and
Wake. T h e presence of Japanese air units in the Caroline and Marshall
islands constituted a threat both to the Midway and Wake bases and
to American aircraft in flight; but defending naval forces were ordered
to take special precautions a t the two bases, and heavy bomber crews
* See map, p. 429,
181

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 863 pages are in the text index: search them above, or from the library's search.