Documents / Document
This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.
“Díaz”6 pages
Edited by Richard W. Orloff, 01/2001/Page 8 Developmental Test Objectives/Detailed Supplementary Objectives DTO 301D: Ascent Structural Capability Evaluation DTO 307D: Entry Structural Capability DTO 312: External Tank Thermal Protection System Performance DTO 667: Portable In-Flight Landing Operations Trainer DTO 805: Crosswind Landing Performance DSO 331: Interaction of Shuttle Launch Entry Suits on Egress Locomotion DSO 487: Immunological Assessment of Crewmembers DSO 491: Characterization of Microbial Transfer Among Crewmembers DSO 492: In-Flight Evaluation of a Portable Clinical Blood Analyzer DSO 493: Monitoring Latent Virus Reactivation and Shedding in Astronauts DSO 802: Educational Activities DSO 901: Documentary Television DSO 902: Documentary Motion Picture Photography DSO 903: Documentary Still Photography
Document, cited by the archive. The PDF is mirrored here; the original link is above. 40 pages are in the text index: search them above, or from the library's search.