Documents / Document
This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.
“Low Earth orbit”5 pages
Edited by Richard W. Orloff, 01/2001/Page 10 MISSION SUMMARY TIMELINE Flight Day 1 Launch/Ascent TSS Checkout and Activation USMP-3 Activation. Flight Day 2 TSS Pre-Deploy Checkout USMP-3 Operations. Flight Day 3 TSS Flyaway USMP-3 Operations. Flight Day 4 TSS Science Operations and Retrieval USMP-3 Operations. Flight Day 5 TSS Retrieval and Docking TSS Post- Retrieval Safing USMP-3 Operations. Flight Day 6 Middeck Glovebox Setup. Flight Day 7-12 USMP-3 Operations. Flight Day 13 USMP-3 Operations Crew News Conference. Flight Day 14 Flight Control System Checkout Reaction Control System Hot-Fire USMP-3 Deactivation Cabin Stow. Flight Day 15 Deorbit Prep Deorbit Burn Entry KSC Landing.
Document, cited by the archive. The PDF is mirrored here; the original link is above. 40 pages are in the text index: search them above, or from the library's search.