Documents / Document

STS-75 press kit

NASA · 40 pages · text from the file's own layer

This is NASA's press kit for Space Shuttle mission STS-75, dated February 1996 and later edited by Richard W. Orloff. It covers Columbia's planned 13-day flight carrying the Italian Tethered Satellite System reflight (TSS-1R) and the third United States Microgravity Payload. The kit sets out launch and landing plans, abort modes, the timeline, payload weights, crew duties, the tether's science objectives and investigators, and crew biographies. It does not mention any unidentified objects.

  • p. 5 …There will be two European Space Agency astronauts -- Maurizio Cheli and Claude Nicollier. Cheli will be…
  • p. 7 …Franklin Chang-Diaz (EV 1), Claude Nicollier (EV 2) Cargo Bay Payloads: Tethered Satellite System USMP…
  • p. 30 …Hoffman and ESA astronaut Claude Nicollier, mission specialists. No copyright is asserted for this photograph. If…
  • p. 36 …Orloff, 01/2001/Page 36 BIOGRAPHICAL DATA Claude Nicollier ESA Astronaut BIRTHPLACE AND DATE: Born September…
Edited by Richard W. Orloff, 01/2001/Page 10
MISSION SUMMARY TIMELINE
Flight Day 1
Launch/Ascent
TSS Checkout and Activation
USMP-3 Activation.
Flight Day 2
TSS Pre-Deploy Checkout
USMP-3 Operations.
Flight Day 3
TSS Flyaway
USMP-3 Operations.
Flight Day 4
TSS Science Operations and Retrieval
USMP-3 Operations.
Flight Day 5
TSS Retrieval and Docking
TSS Post- Retrieval Safing
USMP-3 Operations.
Flight Day 6
Middeck Glovebox Setup.
Flight Day 7-12
USMP-3 Operations.
Flight Day 13
USMP-3 Operations
Crew News Conference.
Flight Day 14
Flight Control System Checkout
Reaction Control System Hot-Fire
USMP-3 Deactivation
Cabin Stow.
Flight Day 15
Deorbit Prep
Deorbit Burn
Entry
KSC Landing.

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. 40 pages are in the text index: search them above, or from the library's search.