Documents / Document
No summary written yet.
Edited by Richard W. Orloff, 01/2001/Page 10 MISSION SUMMARY TIMELINE Flight Day 1 Launch/Ascent TSS Checkout and Activation USMP-3 Activation. Flight Day 2 TSS Pre-Deploy Checkout USMP-3 Operations. Flight Day 3 TSS Flyaway USMP-3 Operations. Flight Day 4 TSS Science Operations and Retrieval USMP-3 Operations. Flight Day 5 TSS Retrieval and Docking TSS Post- Retrieval Safing USMP-3 Operations. Flight Day 6 Middeck Glovebox Setup. Flight Day 7-12 USMP-3 Operations. Flight Day 13 USMP-3 Operations Crew News Conference. Flight Day 14 Flight Control System Checkout Reaction Control System Hot-Fire USMP-3 Deactivation Cabin Stow. Flight Day 15 Deorbit Prep Deorbit Burn Entry KSC Landing.
Not linked to a story yet.
Document, cited by the archive. The PDF is mirrored here; the original link is above. 40 pages are in the text index: search them above, or from the library's search.