Documents / Official release
CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974
Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer
This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."
From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.
“Headquarters”22 pages
- p. 22 …11
Air Force headquarters soon approved Martin's proposal to mod-
•ify" the B-57 and…
- p. 54 …the DCI Jfor Planning and Coordination
I
Headquarters
CIA
USAF -125
I
I I
Foreign…
- p. 55 …total of 357 personnel divided among project headquarters, a US test
ing faci lity. and three…
- p. 56 …until it moved into the new CIA Headquarters building at Langley in
March 1962. The final…
- p. 73 …On 3 August 1955, Dulles
and Twining met at SAC headquarters in Omaha to sign the…
- p. 102 …U-2 project officer, the Air Force Headquarters
project officer, and NACA's top official, Dr…
- p. 107 …did not have to report to higher headquarters. WRSP-1,
known within the Agency as Detachment…
- p. 117 …Late on the evening of 3
July, Bissell went to project headquarters in the Matomic Building…
- p. 127 …The PARAMOUNT
Committee worked inside PID headquarters in the Steuart Building.
Composed of members from CIA…
- p. 138 …later and promptly reported
the conversation to headquarters. When details of Vito's close call
reached…
- p. 153 …project headquarters had already decided that Western Europe
was not a satisfactory location for overflights of…
- p. 168 …110
In June 1958, representatives from the British Air Ministry came
to project headquarters for an…
- p. 191 …commander at Adana, co Air Force
Europe headquarters. and co the Chief of Station at Ankara…
- p. 194 …Because the new government
had not been briefed on the U-2, Project Headquarters refused to…
- p. 205 …its own building to the new
CIA Headquarters at Langley. Soon afterward. Col. Stanley W. Beerli…
- p. 235 …the pilot reported the
incident to Headquarters. The Office of Security immediately con
tacted the Pennsylvania…
- p. 312 …that the performance of an
A-12 with J75 engines (as suggested by project headquarters for…
- p. 319 …been deployed in North
Vietnam.61
Project Headquarters in Langley planned and directed all
operational BLACK…
- p. 323 …Project headquarters informed Deputy Defense
Secretary Vance on lO January I 967 that the A- l…
- p. 324 …President Johnson con
firmed this decision on 21 May."9
- - - Project headquarters selected 8 June 1968…
- p. 334 …Air Force personnel served at all levels of the recon
naissance program, from project headquarters to…
- p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October
1965 (Top Secret Codeword).
Interview with…
70
Sec,et NOfO"N
Chapter 2
First flight of the U-2,
4 August 1955
With Kelly Johnson watching from a chase plane and giving a con
stant stream of instructions, LeYie:r made three more unsuccessful
landing attempts. With the light fading and a thunderstorm fast ap
proaching from the mountains to the west, LeVier made one last ap
proach using the method he had advocated: letting the aircraft touch
on its rear wheel first. This time the U-2 made a near-perfect landing,
which came just in the nick of tim<!. Ten minutes later, the thunder
storm began dumping an unheard-of 2 inches of rain , flooding the dry
lakebed and making the airstrip unusable:1
Now that the first problems in flying and landing the U-2 had
been worked out, Kelly Johnson scheduled the "official" first flight
for 8 August 1955. This time outsiders were present. includi ng
Richard Bissell. Col. Osmond Ritla1nd, Richard Homer. and Garrison
Norton. The U-2 flew to 32,000 feet and performed very well. Kelly
Johnson had met his eight-month deadline."
•• Ibid.. pp. 21 -22: Johnson, .. Log for Project X." 4 August 1955.
.. Johnson. " Log for Project X," 8 August 1955.
Seeret
Not linked to a story yet.
About this file
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.