Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
  • p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
  • p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
  • p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
  • p. 96 …All of the products from this project would be placed in the new control sys tem…
  • p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
  • p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
  • p. 128 …following day, when the next U-2 mission f m the Middle East. After quickly developing…
  • p. 140 …Welzenbach (S); Mission folder 4020 ( 18 March 1957), OSA records, job 67-B-972, box 7…
  • p. 142 …where they would not interfere with the control surfaces. At the ends of these poles, completely…
  • p. 147 …To take ad vantage of these weaknesses, Detachment C staged three missions from Alaska into the…
  • p. 156 …After these missions, penetrat ion overflights became a rarity. There would be only six more during…
  • p. 167 …U-2 missions. To handle U-2 material, the British created a new control system, which…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 169 …where the United Kingdom carried out 27 missions during the two years its pi lots took…
  • p. 170 157 Sec, et MOF'ORI\I Chapter 3 May 1959, and used to fly weather missions…
  • p. 180 …The excellent photography from tnis mission did not reveal a single missile site, but analysts diid…
  • p. 188 …some Soviet airborne-missile fire-control systems. Operation GRAND SLAM, mission 4154 and the 24th deep…
  • p. 191 …key project personnel assembled in the Agency control center that morning (with the exception of Bissell…
  • p. 196 …in cor respondence with Abel's "wife., (probably his Soviet control) in East Germany. In November…
  • p. 204 …in .the DDP in order to maintain control of his overhead reconnais sance projects (the U…
  • p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba. the DOD representatives called…
  • p. 237 …In reality, however, the United States would maintain strict control over the missions to be flown…
  • p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
  • p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
  • p. 348 …System-I used S- and X-band ELINT receivers to collect ground-controlled intercept and air…
  • p. 400 387 Sec1 et NOFORN mission 2023 108 mission 2029 124 mission 3086 200 mission 3088 200…
45
6eeret NOFOAN
Chapter 2
As it turned out, no review of the contract was necessary at the
three-fourths point. Lockheed delivered the aircraft not only on time
but under budget. During the final contract negotiations in the spring
of 1958, Lockheed and the US Government agreed on a price for the
original 20 aircraft of $17,025,542 plus a profit of $1,952,055 for a
total of $18,977,597-less than $1 million for each aircraft. Because
its design was based on Lockheed's F-104, the U-2 was relatively in
expensive even though only a small number of aircraft had been or
dered. Only the wings and tail were unique; Lockheed manufactured
the other portions of the aircraft using the F-104's jigs and dies.
MAJOR DESIGN FEATURES OF THE U-2
Aware of the great need for secrecy in the new project, Kelly Johnson
placed it in Lockheed's Advanced Development facility at Burbank,
California, known as the Skunk Works. 10 Lockheed had established
this highly secure area in 1945 to develop the nation's first jet aircraft,
the P-80 Shooting Star. The small Skunk Works staff began making
the _detailed drawings for the U-2, which was nicknamed the "Angel"
because it was to fly so high.
Kelly Johnson's approach to prototype development was to have
his engineers and draftsmen located not more than 50 feet from the
aircraft assembly line. Difficulties in construction were immediately
brought to the attention of the engineers, who gathered the mechanics
around the drafting tables to discuss ways to overcome the difficul
ties. As a result, engineers were generally able to fix problems in the
design in a matter of hours, not days or weeks. There was no empha
sis placed on producing neatly typed memorandums; engineers sim
ply made pencil notations on the engineering drawings in order to
keep the project moving quickly. 11
A little more than a week after he had been authorized to begin
the project, Kelly Johnson wrote a 23-page report detailing his most
recent ideas on the U-2 proposal. The aircraft, he explained, would be
designed to meet load factors of only 2.5 g's, which was the limit for
transport aircraft rather than combat planes. The U-2 would have a
'" The Lockheed '"Skunk Works" was named after the Kickapoo Joy Juice factory known
as the .. Skonk Works" in Al Capp·s comic strip Li'/ Abner.
Ben A. Rich (current head of the "Skunk Works"). interview by Donald E. Welzenbach
and Gregory W. Pedlow, Burbank, California, 26 August 1988.
6eeret
11

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.