Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 22 …11 Air Force headquarters soon approved Martin's proposal to mod- •ify" the B-57 and…
  • p. 54 …the DCI Jfor Planning and Coordination I Headquarters CIA USAF -125 I I I Foreign…
  • p. 55 …total of 357 personnel divided among project headquarters, a US test ing faci lity. and three…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …project headquarters had already decided that Western Europe was not a satisfactory location for overflights of…
  • p. 168 …110 In June 1958, representatives from the British Air Ministry came to project headquarters for an…
  • p. 191 …commander at Adana, co Air Force Europe headquarters. and co the Chief of Station at Ankara…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward. Col. Stanley W. Beerli…
  • p. 235 …the pilot reported the incident to Headquarters. The Office of Security immediately con tacted the Pennsylvania…
  • p. 312 …that the performance of an A-12 with J75 engines (as suggested by project headquarters for…
  • p. 319 …been deployed in North Vietnam.61 Project Headquarters in Langley planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on lO January I 967 that the A- l…
  • p. 324 …President Johnson con firmed this decision on 21 May."9 - - - Project headquarters selected 8 June 1968…
  • p. 334 …Air Force personnel served at all levels of the recon naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
43
at 1717 H Street, NW. Here the staff remained for the next six years
until it moved into the new CIA Headquarters building at Langley in
March 1962. The final move came in January 1968, when the project
staff (by that time known as the Office of Special Activities) moved
to the Tyler Building in Tysons Comer, Virginia.1
Bissell reported directly to the DCI, although in reality the
DDCI, Gen. Charles Pearre Cabell, was much more closely involved
in the day-to-day affairs of the overhead reconnaissance project.
Cabell's extensive background in Air Force intelligence, particularly
in overhead reconnaissance, made him ideally qualified to oversee the
U-2 project. Cabell frequently attended White House meetings on the
U-2 for the DCI.
FUNDING ARRANGEMENTS FOR
PROJECT AOUATONE
Seth!l NOFORN
Chapter 2
Although Allen Dulles had approved the concept of covert funding
for the reconnaissance project, many financial details remained to be
settled, including the contract with Lockheed. Nevertheless. work on
the U-2 began as soon as the project was authorized. Between 29
November and 3 December 1954, Kelly Johnson pulled together a
team of 25 engineers, which was not easy because he had to take
them off other Lockheed projects without being able to explain why
to their former supervisors. T he engineers immediately began to work
45 hours a week on the project. The project staff gradually expanded
to a total of 8 1 personnel, and the workweek soon increased to 65
hours. 8
DDCI Charles Pearre Cabell
Kelly Johnson's willingness to begin work on the aircraft with
out a contract illustrates one of the most important aspects of this pro
gram: the use of unvouchered funds for covert procurement.
Lockheed was well acquainted with the covert procurement process,
having previously modified several aircraft for covert use by the CI A.
Covert funding for sensiti ve projects sirnpli fies both procure
ment and security procedures because the funds are not attributable to
the Federal Government and there is no public accountabi lity for their
' OSA History. chap. 18. pp. 7-8 (TS Codeword); OSA Chronology. pp. 4. 7. 10. 45 (TS
Codeword).
• Johnson. '"Log for Project X ... 29 November-3 December 1954 (U).
-Sec.et

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.