“Lockheed”60+ pages
- p. 4 …8
Lockheed CL-282 Supporters and the CIA. ........................................ 13
Scientists and Overhead Reconnaissance ............................................... 17
The BEACON…
- p. 6 …260
Competition Between Lockheed and Convair ...................................... 267
The Selection of the Lockheed Design .............. ... ................ ................ 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2
(l 983).
There has also been…
- p. 22 …Immediately after returning to California, Carter proposed to
Lockheed Vice President L. Eugene Root (previously the…
- p. 23 10
Secret ld0F8RN
Chapter 1
Lockheed also submit a design. Carter noted that the proposed aircraft…
- p. 24 …who then asked Lockheed to Kelly Johnson
. sμbmit a specific proposal. In early April, Kelly Johnson…
- p. 25 .
12
Sec,et NOFORN
Chapter 1
The Lockheed CL-282 Development Planning. According to Wienberg, General…
- p. 26 …Despite the Air Force's selection
of the X-16, Lockheed continued to work on the…
- p. 27 …Proposals for special reconnaissance aircraft have been re
ceived in the Air Staff from Lockheed. Fairchild…
- p. 28 …range are not as good as the
Lockheed CL-282. :;
Gardner's enthusiasm for the CL…
- p. 29 …Few detaiils about Dulles's precise attitude
toward the proposed Lockheed reconnaissance aircraft are available,
but…
- p. 37 …for Philip Strong of the CIA had told him that the
Lockheed Aircraft Corporation had designed…
- p. 39 …Thus, even though
the Lockheed CL-282 had several important sources of support by
September I954…
- p. 40 …Council.'A
Project Three Support for the Lockheed CL-282
Chapter 1
James R. Killian, Jr…
- p. 42 …Agency.~·1
Land learned the details of Lockheed's proposed CL-282 aircraft
soon after he…
- p. 43 30
Sec, et NOFORM
Chapter 1
briefly mention a Lockheed design for a high-flying aircraft…
- p. 44 …During September and October the Project Three study group
met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the
reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar
gued that the Bell…
- p. 49 …He used Gardner's
statement to convince Lockheed's senior management to approve the
project, which…
- p. 50 …small group of prominent scientists that the
Lockheed design represented the best possible overhead reconnais-
sance…
- p. 52 …afternoon of 3 Decembeli, they
' Although the Lockheed CL-282 was not designated as the U…
- p. 53 …r the airframes to be built by Lockheed. His query was
greeted with silence. Everyone present…
- p. 55 …This category in
cluded maintenance and support personnel from Lockheed (five per
aircraft), the pilots, and…
- p. 56 …to be
settled, including the contract with Lockheed. Nevertheless. work on
the U-2 began as…
- p. 57 …A general contractor such as Lockheed
can purchase much, if not all, of the supplies needed…
- p. 58 …During the final contract negotiations in the spring
of 1958, Lockheed and the US Government agreed…
- p. 59 …Aircraft," 9 Dc:cc:mbc:r 195-i.
Lockheed Contract Filc:s. OSA Records (S ).
SeeFet
- p. 61 …F. Boc:hrne. Summary Report:
Reconnaissance Aircraft. Lockheed Aircraft Corpor.ition Report I04'.!0. 28 January…
- p. 63 …1954, even before the CIA adopted
the Lockheed proposal. Baker quickly recognized, however, that he
would…
- p. 69 …1-2 (TS Codeword); Miller, Lockheed U-2. pp. 19-20.
Sea,at
- p. 70 …By July 1955 the base
was ready, and Agency, Air Force, and Lockheed personnel began
moving…
- p. 74 61
project-the construction and testing of the aircraft-remained the ex
clusive province of Lockheed…
- p. 77 …The first model of the
pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed
CL-282 was going to be known officially as the…
- p. 81 …former director of Lockheed's Skunk Works.
10 Donald E. Welzenbach, 14 March 1986 (U): Miller…
- p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22.
"' OSA Hiswry, chap. 8, pp. 12-14…
- p. 85 …how to transfer Lockheed employees
from Burbank to Area 5 l without arousing a great deal…
- p. 88 …Colonel Yancey was in charge of six SAC pilots who were to be
trained by Lockheed…
- p. 90 …CIA, which then placed an order with
Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2
cover story stating that a Lockheed-developed aircraft would be flown
by the USAF…
- p. 143 …Lockheed mechanics
had mounted the various RAINBOW devices on the prototype U-2, a
Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed tesi: pilot
Robert Sieker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots. as well as the pro
totype…
- p. 157 …As a substitute,
Lockheed began working to develop a paint with radar-suppressant
qualities, but this…
- p. 162 …After a series of tests over Edwards AFB, Lockheed began coating
the U-2s with a…
- p. 188 …Although it had been refurbished by
Lockheed and now had the more powerful 175 engine that…
- p. 199 …In the meantime Pow1ers began working for Lockheed
as a U-2 pilot. In March 1963…
- p. 200 …Beschloss claims that Powers was tired by Lockheed
for criticizing the Agency in his memoirs (which…
- p. 209 …2
One week later Colonel Geary called to order Lockheed to up
grade six older U…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that
they could be refueled in…
- p. 220 …story, which
was that its pilots were Lockheed employees on a ferry flight to
Puerto Rico…
- p. 230 …for Detachment C
Late in l 958, Lockheed began refitting the Agency's 13 remaining
U…
- p. 235 …STPOLLY
added the more advanced Lockheed P3A in 1963. Between 1955 and
1967, when the CIA…
- p. 236 …U-2 missions, and the Air Force, which had
Lockheed P-2V7 and P3A
reconnaissance aircraft
- p. 238 …The planes were maintained by Lockheed mechanics under con
tract to the CIA. The Agency attempted…
- p. 255 …All Air Force and CIA U-2s were or
dered back to Lockheed for ultrasonic inspection…
- p. 260 …The Agency dispatched several pilots to Taiwan under the cover
of Lockheed employees working on a…
- p. 264 …G in California-with three more at Lockheed undergo
ing repair. The Agency had originally ordered…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who
checked out this new aircraft…
379
RB-58 aircraft
22
Reber. James
81. 114-115. 154,332
reconnaissance
1-9. 12- 19. 21-25, 27, 30-37,
39, 41. 43. 46, 49, 52. 55. 59,
61-62, 66, 80, 84, 94, 96, 98, 109.
113, 115- 116, 119, 122, 126- 127.
133. 153-154. 161-162. 188-193.
196-197, 201, 205-206, 208, 2!0-212.
216. 222-223, 226, 228, 230-233. 240,
249, 253-254, 260. 262-263, 267-268.
270. 287. 291 -292, 295. 297-299, 301.
303-304. 308-309. 311-313. 319-322.
327-331, 333,339, 341-344
reconnaissance aircraft competition
9
reconnaissance drones
301
reconnaissance satellite project
16 1
"reconnaissance strike"
295
Reconnaissance Systems Branch
4
records. altitude
302
records. speed
302
RED DOT
254
reflecting cube
281
reflective system
55
refueling
114. 198-200. 231. 237, 241.
302. 306. 308
refugees
2
Republic RF-84F Thunderflash
22
Research, Directorate of
192. 287
Research and Development, Director of
66
Research and Reports (ORR). Office of
21. 81. 237
Returnee Exploi tation Group (REG)
2
Revolutionary Council
212
-Secret NOFORN
Index
Rhodes
116-117
Ridenour, Louis N.
18
Ridenour Associates. Inc.
18
Rieland, Osmond
56, 61, 70, 78
ROBIN
23
ROBI N HOOD
21 I
Robinson. Robe1t
164
rocket planes
60
rocket-powered ai1rcraft
312
Rodgers. Franklin A.
129, 267-268, 274, 332
Rodgers· Effect
267
Rolls-Royce Avon -109 engines
5, 23
Romania
IOI .
RoO!, L. Eugene
9. 24
Rose, Wilburn S.
Ml '70.l!Qj__________7
runway
57, 68-69, 79-80. 108. 140, 176.
283-284, 29•1. 302, 305
RS-71
295
Ruseckas, Joseph
63
Rusk, Dean
183. 201. 209. 236. 293. 304. 307
Sec.et