This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 19 …staff was the RB-57D in I 955, whose maximum altitude RAF Canberra Mark-PR3 Seeret
  • p. 36 …In 1952 the Royal Air Force (RAF) began Project ROBIN, which was designed to modify the…
  • p. 106 …The U-2s were to use Lakenheath AFB, an RAF base also used by the USAF…
  • p. 107 …penetrated the British radar net work, causing RAF fighters to scramble. Afterward the Air Ministry made…
  • p. 122 …twin-engine Canberra bomber, similar to the RAF overflight of Kapustin Yar in 1953. The US…
  • p. 156 …Range for the first time since the RAF's overflight in 1953, obtaining photographs of a…
  • p. 166 …In November 1958, four RAF officers arrived at Detachment B at Adana. thus beginning the United…
  • p. 167 …ask Air Vice Marshal MacDonald if the RAF was prepared to '"" See, for ex:ample, the…
  • p. 168 …MacDonald agreed to Bissell's proposal and began recruiting RAF pilots to fly the U-2…
  • p. 169 …Most flights by the RAF pilots in Detachment B, however, took place in the Middle East…
  • p. 177 …For almost a year, the RAF pilots of Detachment B had been ready to fly over…
  • p. 194 …A four-man unit of RAF U-2 pilots was stationed at Detachment G, Edwards AFB…
  • p. 200 …approval authority for missions conducted by the RAF pilots in Detachment 8. The loss of Powers…
  • p. 316 …Project IDEALIST U-2 flying from an RAF facility in Great Britain. The OXCART would fly…
  • p. 332 …1960, the need for British participation lessened. RAF pilots henceforth flew only training or ferry missions…
  • p. 339 …P-E PFIAB PI PIC PID PSAC RAF RFP SAB SAC SAC SA/PC/DCI SAM…
  • p. 351 …4154 Powers Peshawar B B Tyuratam, Kyshtym, Sverdlovsk; downed by SAM a RAF pilot Sec1 et
  • p. 402 …Louis 29 Watertown Strip 57 Watton RAF Base. England 156 "weather plane" cover story 179 weather…
341
or more of the aircraft was always being repaired, and eventually
three of the five AQUILINE prototypes were destroyed in testing.
Although AQUILINE's visual and accoustic signatures were
very small, its radar cross section continued to cause problems. The
radar cross section at low frequencies was less than one-tenth of a
square meter, giving it a radar signature smaller than that of an eagle,
but there were flares in the VHF region that increased the likelihood
of detection.
Studies indicated that the radar cross section problems could
eventually be reduced to acceptable levels, but the greatest weakness
of the AQUILINE project was its navigational system. AQUILINE
did not have a programmable autopilot; it had to be flown by remote
control from the ground. Once the aircraft flew over the horizon. all
navigational commands had to be relayed to it by high-flying aircraft.
A DC-6 loitering at 25,000 feet would give AQUILINE a range of
250 nautical miles: use of a U-2 at 70,000 feet could increase this to
350 nautical miles.
- -Such a range was suitable for the targets originally conceived for
AQUILINE, but the need for intelligence on targets located much
dee er in the Soviet Union and the Peo le's Re ublic of China
and the development time and costs for
~~~~~-c---~
AQUILINE began to soar. By l971 ORD had spent six years and $33
million on AQUILINE but still had many important problems to re
solve.
At this point the project was turned over to the Office of Special
Activities for operational testing at Area 51 in Nevada. Flight tests
showed the aircraft to be successful by the standards originally set for
the project in l 967, as it flew l 30 miles and obtained very high reso
lution photography of a target before returning successfully to the
original launchsite. However, improving AQUILINE sufficiently to
make it a practical long-range reconnaissance system was estimated
to cost another $35 million and take two to three years. On the recom
mendation of DDS&T Carl Duckett on I November l 971, Project
AQUILINE was canceled. The project's aircraft and equipment were
eventually transferred to the US Army for use in a battlefield manage
ment system known as AQUILA, which has yet to be deployed be
cause of continuing developmental problems.
Sectet NOfORN