Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 24 …April 1954. Lo.:khec:d Corporation. Advanced Devdopmcnt Projec:ts Divi~ion. Burbank. California. Sec,et
  • p. 58 …Pedlow, Burbank, California, 26 August 1988. 6eeret 11
  • p. 85 …how to transfer Lockheed employees from Burbank to Area 5 l without arousing a great deal…
  • p. 273 …SP-1362, "History of the OXCART Program," Lockheed Aircraft Corporation, Burbank, CA. I July 1968, p…
  • p. 287 …designed trailer truck that carried it from Burbank to Area 5 I. By 18 November 1959…
  • p. 296 …not test the OXCART aircraft at its Burbank facility, where the runway was too short and…
  • p. 297 …Construction began in September 1960; a C-47 shuttle s,ervice ferried work crews from Burbank…
  • p. 299 …The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later…
  • p. 304 …into the engine nacelles during assembly at Burbank were sucked into the power plant during initial…
  • p. 372 …293 BUORL 22 Burbank. California 45 &eeret NOFe"N Index Burke. William 168 120 114 Byeloruss1a…
341
or more of the aircraft was always being repaired, and eventually
three of the five AQUILINE prototypes were destroyed in testing.
Although AQUILINE's visual and accoustic signatures were
very small, its radar cross section continued to cause problems. The
radar cross section at low frequencies was less than one-tenth of a
square meter, giving it a radar signature smaller than that of an eagle,
but there were flares in the VHF region that increased the likelihood
of detection.
Studies indicated that the radar cross section problems could
eventually be reduced to acceptable levels, but the greatest weakness
of the AQUILINE project was its navigational system. AQUILINE
did not have a programmable autopilot; it had to be flown by remote
control from the ground. Once the aircraft flew over the horizon. all
navigational commands had to be relayed to it by high-flying aircraft.
A DC-6 loitering at 25,000 feet would give AQUILINE a range of
250 nautical miles: use of a U-2 at 70,000 feet could increase this to
350 nautical miles.
- -Such a range was suitable for the targets originally conceived for
AQUILINE, but the need for intelligence on targets located much
dee er in the Soviet Union and the Peo le's Re ublic of China
and the development time and costs for
~~~~~-c---~
AQUILINE began to soar. By l971 ORD had spent six years and $33
million on AQUILINE but still had many important problems to re
solve.
At this point the project was turned over to the Office of Special
Activities for operational testing at Area 51 in Nevada. Flight tests
showed the aircraft to be successful by the standards originally set for
the project in l 967, as it flew l 30 miles and obtained very high reso
lution photography of a target before returning successfully to the
original launchsite. However, improving AQUILINE sufficiently to
make it a practical long-range reconnaissance system was estimated
to cost another $35 million and take two to three years. On the recom
mendation of DDS&T Carl Duckett on I November l 971, Project
AQUILINE was canceled. The project's aircraft and equipment were
eventually transferred to the US Army for use in a battlefield manage
ment system known as AQUILA, which has yet to be deployed be
cause of continuing developmental problems.
Sectet NOfORN
Appendix E
Sec.et

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.