This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design." Another factor in the rejection of Kelly Johnson's…
  • p. 26 …19 On 7 June 1954, Kelly Johnson received a letter from the Air Force rejecting the…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson' s revolutionary design a reality, one addit ional source of support was…
  • p. 42 …it. A lthough Land had heard Allen Donovan '' James R. Killian. Jr.. interview by Donald E…
  • p. 48 …do the job in Johnson's airplane. And further, I overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …Ben A. Rich (current head of the "Skunk Works"). interview by Donald E. Welzenbach and Gregory…
  • p. 69 …staff) flew over Nevada with Kelly Johnson in a small Beechcraft plane piloted by Lockheed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Battin suggested the method used by Nazi war criminal Hermarnn Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a '·wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 …The committee examined two other Kelly Johnson designs at this meeting-a tailless subsonic aircraft with…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
297
~eeret NOFOPU''l
Chapter 6
decided to go to Nevada and take charge of the OXCART's develop
ment himself. His presence made a big difference, as can be seen in
his notes in the project log:
I uncovered many items of a managerial, materiel and design na-
ture.... I had meetings with vendors to improve their opera-
tion.... Changed supervision and had daily talks with them,
going over in detail all problems on the aircraft .... Increased the
supervision in the electrical group by 500% .... We tightened up
the inspection procedures a great deal and made inspection stick.
It appears that the problems are one-third due to bum engineer
ing.... The addition of so many systems to the A-12 has greatly
complicated the problems, but we did solve the overall problem."''
These improvements in on-site management got the project back on
schedule.
By 20 November 1965, the final validation flights for OXCART
deployment were finished. During these tests. the OXCART achieved
a maximum speed of Mach 3.29. an altitude of 90,000 feet. and sus
tained flight time above Mach 3.2 of 74 minutes. The maximum
- errdurance test lasted six hours and 20 minutes. On 22 November.
Kelly Johnson wrote to Brig. Gen. Jack C. Ledford. head of the
Office of Special Activities, stating. "'The time has come when the
bird should leave its nest. .. ""
Three years and seven months after its first flight in April 1962.
the OXCART was ready for operational use. It was now time to find
work for the most advanced aircraft ever conceived and built.
DISCUSSIONS ON THE OXCART'S
FUTURE EMPLOYMENT
Although the OXCART had been designed to replace the U-2 as a
strategic reconnaissance aircraft to fly over the Soviet Union, this use
had become doubtful long before the OXCART was ready for
operational use. The U-2 Affair of 1960 made Presidents very reluc
tant to consider overflights of the Soviet Union. Indeed. Presidents
Eisenhower and Kennedy had both stated publicly that the United
States would not conduct such overflights. In July 1962. Secretary of
"Johnson, .. Archangel log," 5 August-30 April 1965.
''' Minnich, "'OXCART Story... p. 23 (S).
Secret

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.