Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 18 …Leghorn persuaded his superiors to submit his suggestion to the Pentagon for funding. He had not…
  • p. 20 …Meanwhile Leghorn, frustrated by the rejection of his original concept, had transferred to the Pentagon in…
  • p. 22 …become the assistant director of Lockheed's Advanced Development Program, was in the Pentagon on business…
  • p. 24 …for the construction and maintenance of 30 aircraft to a group of senior Pentagon official s…
  • p. 26 …He had been present at Kelly Johnson's presentation on the CL-282 at the Pentagon…
  • p. 27 …with Strong in the Pentagon on 12 May 1954, six clays before the Wright Air Deve…
  • p. 52 …Late on the morning of 2 December 1954, Dulles told Bissell to go to the Pentagon…
  • p. 91 …He then briefed a high-level Pentagon panel that included the Secretary of the Air Force…
  • p. 92 …After a half hour passed, the base commander called the Pentagon to ask where the crippled…
  • p. 225 …By 25 September 1957, the National Security Council had become concerned with the course of events…
  • p. 251 …Early in 1963 the Agency sought special funds from the Pentagon to de velop a high…
  • p. 363 …CIA and Pentagon Covert Operations Since World War fl. New York: William Morrow, 1986. ---. The Soviet…
286
Seeret NOFOAN
Chapter 6
DELIVERY OF THE FIRST OXCART
The first A- l 2, known as article 121, was assembled and tested at
Burbank during January and February 1962. Since it could not be
flown to the Nevada site, the aircraft had to be partially disassembled
and put on a specially designed trailer that cost nearly S 100,000. The
entire fuselage, without the wings, was crated and covered, creating a
load 35 feet wide and 105 feet long. To transport this huge load safely
over the hundreds of miles to the site. obstructing road signs were re
moved, trees were trimmed, and some roadbanks had to be leveled.
The plane left Burbank on 26 February 1962 and arrived at Area 51
two days later.
After the fuselage arrived in Nevada, its wings were attached and
the 175 engines were installed. but the aircraft was still not ready to be
tested. This new delay was caused by leaking fuel tanks, a problem
that would never be solved completely. Because the A- I 2's high
speeds heat the titanium airframe to more than 500°F. Lockheed
designers had to make allowances for expansion. When the metal was
cold, the expansion joints were at their widest. In the fuel tanks. these
gaps were filled by pliable sealants. but the fuel for the A-12's engines
acted as a strong reducing agent that softened the sealants. causing
leaks. Thus. when fuel was first poured into the aircraft, 68 leaks
developed. Lockheed technicians then stripped and replaced all the
sealant, a tedious and time consuming procedure because the sealant
required four curing cycles, each at a different temperature over a
period of 30 to 54 hours. The engineers were never able to discover a
sealant compound that was completely impervious to the jet fuel while
remaining elastic enough to expand and contract sufficiently. The
A- I 2's tanks continued to leak, so when it was fueled, it only received
enough fuel to get airborne. The plane would then rendezvous with a
tanker, top off its tanks, and immediately climb to operating altitude.
causing the metal to expand and the leaks to stop. 10
CHANGES IN THE PROJECT MANAGEMENT
Richard Bissell, whose concern for the viability of the U-2 in 1956
had led to the establishment of Project OXCART and who had di
rected its growth all along, was no longer in charge when the first
"' OSA fiistorv. chap. 20. p. 62 (TS C0<.!t:worJJ: \linnich ...OXCART Story." p. 11 (S).
Secret

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.