Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 18 …Leghorn persuaded his superiors to submit his suggestion to the Pentagon for funding. He had not…
  • p. 20 …Meanwhile Leghorn, frustrated by the rejection of his original concept, had transferred to the Pentagon in…
  • p. 22 …become the assistant director of Lockheed's Advanced Development Program, was in the Pentagon on business…
  • p. 24 …for the construction and maintenance of 30 aircraft to a group of senior Pentagon official s…
  • p. 26 …He had been present at Kelly Johnson's presentation on the CL-282 at the Pentagon…
  • p. 27 …with Strong in the Pentagon on 12 May 1954, six clays before the Wright Air Deve…
  • p. 52 …Late on the morning of 2 December 1954, Dulles told Bissell to go to the Pentagon…
  • p. 91 …He then briefed a high-level Pentagon panel that included the Secretary of the Air Force…
  • p. 92 …After a half hour passed, the base commander called the Pentagon to ask where the crippled…
  • p. 225 …By 25 September 1957, the National Security Council had become concerned with the course of events…
  • p. 251 …Early in 1963 the Agency sought special funds from the Pentagon to de velop a high…
  • p. 363 …CIA and Pentagon Covert Operations Since World War fl. New York: William Morrow, 1986. ---. The Soviet…
284
Geeret NOFORN
Chapter 6
storage capacity, and runway lelllgth were insufficient for the
OXCART program. the site 's remot,e location would greatly ease the
task of maintaining the program's security, and a moderate construc
tion program could provide adequate facilities. Construction began in
September 1960; a C-47 shuttle s,ervice ferried work crews from
Burbank to Las Vegas and from Las Vegas to the site.
The new 8,500-foot runway was completed by 15 November
1960. Kelly Johnson had been reluctant to have a standard Air Force
runway with expansion joints every 25 feet because he feared the
joints wou ld set up undesirable vibirations in the speedy aircraft At
his suggestion a 150-foot wide runway was therefore constructed of
six 25-foot-wide longitudinal sections, each 150 feet long but stag
gered. This layout put most of the expansion joints parallel to the di
rection of airer-aft roll and reduced the frequency of the joints.
Additional improvements included the resurfacing of 18 miles of
highway leading to the base so that heavy fuel trucks could bring in
the necessary fuel. The need for additional bui ldings on the base was
met by the Navy. Three surplus Navy hangars were dismantled.
mo\'ed, and reassembled on the north side of the:: base. and more than
100 surplus Navy housing buildings were also transported to Area 51.
All essential facilities were ready in time for the forecast delivery
date of the first A- I 2 on I August 1961.~"
Unfortunately. this delivery date began to slip further and further
into the future. Delays in obtaining the titanium, and lacer the J58 en
gines. caused the postponement of the final assembly of the first plane.
Eventually, Kelly Johnson and Agency project offic ials decided to be
gin testing without waiting for the J58 engines by using Pratt &
Whitney J75/l 9W engines. designed for the Convair F- 1.06. to test the
A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such
a change, however, meant that the engine compartment of the first air
craft had to be reconfigured to accommodate the J75 engine. Lockheed
hoped that this substitution would petrmit the delivery of the first A-12
by 22 December l 961 and its initial test flight by 27 February 1962.
L ockheed ran into so many technological problems with the
OXCART effort that by October 196 I its costs had swollen to $ 136
million and were still climbing. Something obviously had to be done
"· OSA History. chap. :!O. pp. 39-10. 4 ). 51 1TS CoJcword): Minnich. ··oxCART Story:·
pp. ,.9 (SJ.
Seeret

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.