Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 22 …11 Air Force headquarters soon approved Martin's proposal to mod- •ify" the B-57 and…
  • p. 54 …the DCI Jfor Planning and Coordination I Headquarters CIA USAF -125 I I I Foreign…
  • p. 55 …total of 357 personnel divided among project headquarters, a US test ing faci lity. and three…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …project headquarters had already decided that Western Europe was not a satisfactory location for overflights of…
  • p. 168 …110 In June 1958, representatives from the British Air Ministry came to project headquarters for an…
  • p. 191 …commander at Adana, co Air Force Europe headquarters. and co the Chief of Station at Ankara…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward. Col. Stanley W. Beerli…
  • p. 235 …the pilot reported the incident to Headquarters. The Office of Security immediately con tacted the Pennsylvania…
  • p. 312 …that the performance of an A-12 with J75 engines (as suggested by project headquarters for…
  • p. 319 …been deployed in North Vietnam.61 Project Headquarters in Langley planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on lO January I 967 that the A- l…
  • p. 324 …President Johnson con firmed this decision on 21 May."9 - - - Project headquarters selected 8 June 1968…
  • p. 334 …Air Force personnel served at all levels of the recon naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
284
Geeret NOFORN
Chapter 6
storage capacity, and runway lelllgth were insufficient for the
OXCART program. the site 's remot,e location would greatly ease the
task of maintaining the program's security, and a moderate construc
tion program could provide adequate facilities. Construction began in
September 1960; a C-47 shuttle s,ervice ferried work crews from
Burbank to Las Vegas and from Las Vegas to the site.
The new 8,500-foot runway was completed by 15 November
1960. Kelly Johnson had been reluctant to have a standard Air Force
runway with expansion joints every 25 feet because he feared the
joints wou ld set up undesirable vibirations in the speedy aircraft At
his suggestion a 150-foot wide runway was therefore constructed of
six 25-foot-wide longitudinal sections, each 150 feet long but stag
gered. This layout put most of the expansion joints parallel to the di
rection of airer-aft roll and reduced the frequency of the joints.
Additional improvements included the resurfacing of 18 miles of
highway leading to the base so that heavy fuel trucks could bring in
the necessary fuel. The need for additional bui ldings on the base was
met by the Navy. Three surplus Navy hangars were dismantled.
mo\'ed, and reassembled on the north side of the:: base. and more than
100 surplus Navy housing buildings were also transported to Area 51.
All essential facilities were ready in time for the forecast delivery
date of the first A- I 2 on I August 1961.~"
Unfortunately. this delivery date began to slip further and further
into the future. Delays in obtaining the titanium, and lacer the J58 en
gines. caused the postponement of the final assembly of the first plane.
Eventually, Kelly Johnson and Agency project offic ials decided to be
gin testing without waiting for the J58 engines by using Pratt &
Whitney J75/l 9W engines. designed for the Convair F- 1.06. to test the
A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such
a change, however, meant that the engine compartment of the first air
craft had to be reconfigured to accommodate the J75 engine. Lockheed
hoped that this substitution would petrmit the delivery of the first A-12
by 22 December l 961 and its initial test flight by 27 February 1962.
L ockheed ran into so many technological problems with the
OXCART effort that by October 196 I its costs had swollen to $ 136
million and were still climbing. Something obviously had to be done
"· OSA History. chap. :!O. pp. 39-10. 4 ). 51 1TS CoJcword): Minnich. ··oxCART Story:·
pp. ,.9 (SJ.
Seeret

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.