Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
  • p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
  • p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
  • p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
  • p. 96 …All of the products from this project would be placed in the new control sys tem…
  • p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
  • p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
  • p. 128 …following day, when the next U-2 mission f m the Middle East. After quickly developing…
  • p. 140 …Welzenbach (S); Mission folder 4020 ( 18 March 1957), OSA records, job 67-B-972, box 7…
  • p. 142 …where they would not interfere with the control surfaces. At the ends of these poles, completely…
  • p. 147 …To take ad vantage of these weaknesses, Detachment C staged three missions from Alaska into the…
  • p. 156 …After these missions, penetrat ion overflights became a rarity. There would be only six more during…
  • p. 167 …U-2 missions. To handle U-2 material, the British created a new control system, which…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 169 …where the United Kingdom carried out 27 missions during the two years its pi lots took…
  • p. 170 157 Sec, et MOF'ORI\I Chapter 3 May 1959, and used to fly weather missions…
  • p. 180 …The excellent photography from tnis mission did not reveal a single missile site, but analysts diid…
  • p. 188 …some Soviet airborne-missile fire-control systems. Operation GRAND SLAM, mission 4154 and the 24th deep…
  • p. 191 …key project personnel assembled in the Agency control center that morning (with the exception of Bissell…
  • p. 196 …in cor respondence with Abel's "wife., (probably his Soviet control) in East Germany. In November…
  • p. 204 …in .the DDP in order to maintain control of his overhead reconnais sance projects (the U…
  • p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba. the DOD representatives called…
  • p. 237 …In reality, however, the United States would maintain strict control over the missions to be flown…
  • p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
  • p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
  • p. 348 …System-I used S- and X-band ELINT receivers to collect ground-controlled intercept and air…
  • p. 400 387 Sec1 et NOFORN mission 2023 108 mission 2029 124 mission 3086 200 mission 3088 200…
Secret i<JOFOHl'iJ
Chapter 6
278
to achieve the desired target altitude of 91,000 feet. Afterward. he
noted in the project log: ··we have no performance margins left; so
this project. instead of being 10 times as hard as anything we have
done, is 12 times as hard. This matches the design number and is ob
viously right." ,,,
These changes satisfied Bissell, who notified Johnson on 26
January that the CIA was authorizing the construction of 12 of the
new aircraft. The actual contract was signed on 11 February l 960.
Lockheed's original quotation for the project was $96.6 million for l 2
aircraft, but technological difficulties eventually made this price im
possible to meet. Recognizing that fabricating an aircraft from tita
nium might involve unforeseen difficulties, the CIA included a clause
in the contract that allowed costs to be reevaluated. During the next
five years. this clause had to be invoked on a number of occasions as
the A-12's costs soared to more than double the original estimate."'
NEW TECHNOLOGIES NECESSITATED
BY OXCART'S HIGH SPEED
According to the specifications. the OXCART aircraft was to achieve
a speed of Mach 3.2 (2.064 knots or 0.57 miles per second. which
would make it as fast as a rifle bullet). have a range of 4.120 nautical
miles. and reach altitudes of 84.500 to 97,600 feet. The new aircraft
would thus be more than five times as fast as the U-2 and would go
almost 3 miles higher.
One major disadvantage of the OXCART's great speed was high
temperatures. Flying through the earth's atmosphere at Mach 3.2
heated portions of the aircraft's skin to almost 900°F. An aircraft op
erating at these high speeds and high temperatures required fuels. lu
bricants, and hydraulic fluids that had not yet been invented. The
OXCART's fuel requirement called for a low-vapor-pressure fuel
with a low volume at operating temperatures; the fuel would also be
used as a heat sink to cool various parts of the aircraft. The 158 en
gines required lubricants that did not break down at the very high op
erating temperatures of Mach 3.2 speeds. This requirement led to the
,., Johnson... Archangc I log," 2 I January I960.
'" OSA Hiswry. chap. 20. pp. 27-29. 33-34, 36 (TS Colkword).
6ee1et

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.