This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 22 …11 Air Force headquarters soon approved Martin's proposal to mod- •ify" the B-57 and…
  • p. 54 …the DCI Jfor Planning and Coordination I Headquarters CIA USAF -125 I I I Foreign…
  • p. 55 …total of 357 personnel divided among project headquarters, a US test ing faci lity. and three…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …project headquarters had already decided that Western Europe was not a satisfactory location for overflights of…
  • p. 168 …110 In June 1958, representatives from the British Air Ministry came to project headquarters for an…
  • p. 191 …commander at Adana, co Air Force Europe headquarters. and co the Chief of Station at Ankara…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward. Col. Stanley W. Beerli…
  • p. 235 …the pilot reported the incident to Headquarters. The Office of Security immediately con tacted the Pennsylvania…
  • p. 312 …that the performance of an A-12 with J75 engines (as suggested by project headquarters for…
  • p. 319 …been deployed in North Vietnam.61 Project Headquarters in Langley planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on lO January I 967 that the A- l…
  • p. 324 …President Johnson con firmed this decision on 21 May."9 - - - Project headquarters selected 8 June 1968…
  • p. 334 …Air Force personnel served at all levels of the recon naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
269
~,et NOFOAN
Chapter 6
to be ignited. Since ramjet engines had only been tested in wind tun
nels, there was no available data to prove that these engines would
work in the application proposed by Convair. The second uncertain
factor was the B-58B bomber that was supposed to achieve Mach 2.2
before launching the FISH above 35 ,000 feet. This version of the
B-58 was still in the design stage.
Convair's proposal suffered a major setback in June 1959, when
the Air Force canceled the 8-58B project. Conversion of the older,
slower B-58A into a supersonic launching platform for the FISH was
ruled out by the high cost and technical difficulties invol ved.
Moreover, the Air Force was unwilling to part with two aircraft from
the small inventory of its most advanced bomber. Even had the B-588
program not been canceled, however, the FISH proposal would proba
bly not have been feasible. Convair engineers had calculated that the
added weight of the FISH would prevent the B-588 from achieving
the speed required to ignite the parasite aircraft's ramjet engines.
The Convai r proposal was therefore unusable, but the Lockheed
design with its high radar cross section was also unacceptable to the
Land committee. On 14 July 1959, the committee rejected both
Lockheed A · 11
Sec,et

Not linked to a story yet.