Documents / Official release

CIA-UAP-003, The Central Intelligence Agency and Overhead Reconnaissance; The U-2 and OXCART Programs, 1954-1974

Central Intelligence Agency · 1954 · 406 pages · text from the file's own layer

This is a Secret History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach of the Central Intelligence Agency, published in 1992. It gives a history of the CIA's manned overhead reconnaissance program from 1954 to 1974, covering the development and operation of the U-2 and the A-12 OXCART aircraft. It covers overflights of the Soviet Union, the 1960 downing of Francis Gary Powers, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

From the source:Release of 2026-06-12 This CIA History Staff document chronicles the complete history of the U-2 and OXCART (A-12) high-altitude reconnaissance aircraft programs from 1954 to 1974, detailing their development, operations over the Soviet Union and other targets worldwide, the famous downing of Francis Gary Powers in 1960, organizational reforms following that incident, and the eventual transfer of operations from CIA to Air Force control. A more redacted version of this document has been available on CIA's public website.

  • p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
  • p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
  • p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
  • p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
  • p. 96 …All of the products from this project would be placed in the new control sys tem…
  • p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
  • p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
  • p. 128 …following day, when the next U-2 mission f m the Middle East. After quickly developing…
  • p. 140 …Welzenbach (S); Mission folder 4020 ( 18 March 1957), OSA records, job 67-B-972, box 7…
  • p. 142 …where they would not interfere with the control surfaces. At the ends of these poles, completely…
  • p. 147 …To take ad vantage of these weaknesses, Detachment C staged three missions from Alaska into the…
  • p. 156 …After these missions, penetrat ion overflights became a rarity. There would be only six more during…
  • p. 167 …U-2 missions. To handle U-2 material, the British created a new control system, which…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 169 …where the United Kingdom carried out 27 missions during the two years its pi lots took…
  • p. 170 157 Sec, et MOF'ORI\I Chapter 3 May 1959, and used to fly weather missions…
  • p. 180 …The excellent photography from tnis mission did not reveal a single missile site, but analysts diid…
  • p. 188 …some Soviet airborne-missile fire-control systems. Operation GRAND SLAM, mission 4154 and the 24th deep…
  • p. 191 …key project personnel assembled in the Agency control center that morning (with the exception of Bissell…
  • p. 196 …in cor respondence with Abel's "wife., (probably his Soviet control) in East Germany. In November…
  • p. 204 …in .the DDP in order to maintain control of his overhead reconnais sance projects (the U…
  • p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba. the DOD representatives called…
  • p. 237 …In reality, however, the United States would maintain strict control over the missions to be flown…
  • p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
  • p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
  • p. 348 …System-I used S- and X-band ELINT receivers to collect ground-controlled intercept and air…
  • p. 400 387 Sec1 et NOFORN mission 2023 108 mission 2029 124 mission 3086 200 mission 3088 200…
238
Setret PdOFQRl)I
Chapter 5
ground force installations .. .would require about two man-years
work, backed up by a larger expansion of photointerpretation ef
fort.,, S3
Use of Infrared Scanner Over PRC Nuclear Plants
Photographic missions were not the only method used by the Agency
to gather information on the PRC's progress in developing nuclear
weapons. fn fact, standard overhead photography was of little value in
determining whether or not various nuclear-related facilities were
producing weapon-grade materials. Such information could onl1y be
obtained from agent reports or infrared imaging of the targets. which
would reveal the heat associated with nuclear-refining activity. Early
in 1963 the Agency sought special funds from the Pentagon to de
velop a high-resolution infrared scanner for the U-2 in order to ascer
tain the operntional status of Chinese nuclear reactors. After this
request was turned down. the Agency decided to fund the develop
ment of such a scanner itself. In the spring of 1963, the Office of
Research and Development (ORD) signed a contract with the Texas
Instruments C'Jmoration for the :roduction of an infrared scanner that
would operat ~----:---,.~-- ~ To conceal the intended
purpose of the scanner, the dev ices were called forest fire dete,ctors
and assigned model numbers such as "FFD-I ...
Tests conducted in Septe ~3 oro...-ed that model FFD-2
was ca • f reveal incr activit ·-------- -~~
I ~ Further im-
provements followed, and on 26 October 1964 ORUcleclarecl the
infrared unit operational. In reporting the successful results of the in
frared testing to DCI McCone. ORD Director Robert Chapman men
tioned that there was only one such unit in existence. McCone
immedi ately told Chapman to order more, and the Agency then pur
chased several for Project TACKLE and a stereo-configured FFD-4
for Project OXCART.
DC[ McCone reviewed these infrared detection developments
with Defense Secretary McNamara and his new deputy, Cyrus Vance,
on 30 October. being careful to point out that the new device was a
E..-ncv-snnnsored R&D because the Pentagon had ref~
'• ORR. M.:moran<lum tor tho: R.:cord. 11 January 1965, OSA records (TS Co<l.:wonJ).
So5ret

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.