Documents / Official release
This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.
From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.
“Mission Control”5 pages
89 the flight, down in the vicinity of my right foot in the center pedestal lower area there, around the cabin heat exchanger, we got a lot of condensation. It was very wet on the walls a.nd the blotter paper was sopping wet, a radius of about 12 inches on the lower right pedestal, on my side. I do not know how it was on your side. Lovell It started getting wet on my side, the inboard. Borman Yes, inboard side. That is the only place in the spacecraft that I noticed any condensation. As far as I know the evap orator only operated during l aunch and the first orbit. We also had one other day when we woke up and were tumbling quite badly and the wall temperatures were 16 degrees to 20 degrees lower th.an we ever recorded tb1;!m before. I suspect that the evaporator might have worked that night. We men tioned this to the ground and••.let's see, I have some notes on that. Lovell It probably got filled up from the moisture going into the system. Borman This was noted in the data for the cabin temperature surveys also. I don't remember exactly what day it was, where we noticed this big change in temperature. Lovell It was &bout 5 or 6 days after the mission started, wasn't it?
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.