This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
88
o2. We have already talked about the co2 partial pressure.
It was below zero the entire flight except during tape dumps
when it jumped up due to a glitch that the tape dump puts in
the TM system. Radiator operation and configuration••• We
ran radiator on all the time except for two checks that were
made. Actually when we opened circuited the fuel cells be
fore we brought them back on the line, we went to RADIATOR
BYPASS twice. Then we went to ·RADIA'IDR BYPASS once when we
wanted to get the water out of the ECS System. One time
during the flight we were picking up water. This might be
a good place to cover that. We were picking up water coming
out of our suit inlet hose, in quite large quantities. We
called the ground, and they suggested that perhaps the vater
boiler was not venting. They called up the procedure that
included putting on evaporator heat, turning off the radia
tor and going to bypass on the radiators and rota.ting the
spa cecraft at 10 degrees per second. This threw out large
amount of water and things got back to normal. Later on in
the flight we noticed the same thing, but we were busy align
ing the platform and other things and we did not want to
setup rol l -rates. All we did was put the suit coolant to
warm and put both suit fans on and blew the water out of
t he system, and that worked also. We did notice that during

About this file