Documents / Official release
Gemini 7 Technical Debriefing, 1965
National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer
This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.
From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.
“Borman”60+ pages
- p. 11 ....
1.0 COUNTDOWN
1.1 Crew Insertion
Borman I have no comment. I thought it went…
- p. 12 2
1.5 ECS
Borman ECS worked fine. We had no trouble with ECS at all…
- p. 13 …2 .0 POWERED FLIGHT
2.1 Liftoff Cues
Borman Stoney came in loud e.nd c…
- p. 14 …2.2 Roll Program
Borman The roll program, was so short it was almost like a…
- p. 15 …2.4 Aerodynamic
Borman Age.in, we had had this described to us ma.ny times…
- p. 16 6
2.7 Wind shear
Borman Wind s hear. I did not notice any.
Lovell I…
- p. 17 7
Lovell
Borman
Borman
Lovell
Borma.n
Borman
Lovell
I did not notice any POGO.
2…
- p. 18 …2.14 BECO
Borman At BECO, the whole spacecraft was engulfed in a red flame .
I…
- p. 19 9
Eorma.n
Lovell
:Borman
:Borman
Lovell
:Borman
Borman
Lovell
:Borman
that particul ar time.
2…
- p. 20 …2.20 Acceleration
Borman Acceleration during stage 2 was right on the money, right on
the…
- p. 21 …Lovell Okay.
:Borman In fact, I did not use the thrusters at all for that. I…
- p. 22 12
Borman 17, 30, and 20. There might have been a 13, 17, a.nd 20…
- p. 23 …the
primary station. The UHF was outstanding.
Borman We have already discussed GO/NO GO. They…
- p. 24 …to men
tion that address 72 read --
Borman Nominal was 25 804 and address 72 read…
- p. 25 15
Borman Could you identify any type of the debris?
Lovell No, pieces.That is all…
- p. 26 16
:Borman We were looking right into the sun; I hope they do too. The
drogu…
- p. 27 …3.4 Post station-keeping
Borman We did not do anything with stowage on the first…
- p. 29 …We actv.ally separa
ted at 00:-21.
:Borman That is right. So we separated because…
- p. 30 …you cannot tell from a
flashing light.
Borman Especially on vehicles rotating. I do not think…
- p. 31 …powered down and then waited two hours?
:Borman Tha t is right . This is one of…
- p. 33 …more because we were still at ~ ogee.
Borman The first a:f many powerdowns was no…
- p. 34 …have a lot of comments on it.
Borman Let's start from the beginning.
Lovell The…
- p. 35 …We bad 3 or 4 a day.
Borman 5:20,we started unpacking the meals. This…
- p. 36 …wanted to pump up and make sure.
Borman It worked fine and we got right back…
- p. 37 …also i sometrics three times
a day.
Borman They were programmed 10 minutes. I think a…
- p. 38 28
Borman At 49t53 we got a picture of Houston with the 250 .mm l ens…
- p. 39 …wonder really if it was worth it.
Borman At about 166,40 we noted our drift…
- p. 40 …Lovell Yes, I know, I just thought :maybe we could hear it or
so.mething.
:Borman…
- p. 41 …Apollo landmarks were shot because of clouds.
Borman On the 6 l auncht the second ti…
- p. 42 …5.0 REIBOFIRE
5.1 TR-2:00 Power Up and Alignment Checklist
Borman We had…
- p. 43 33
fl i ght.
Borman We were flying with bus ties and tu.el cells and…
- p. 44 . 34
:Borman
Lovell
:Borman
Lovell
:Sorms..n
Lovel l
:Borm&n
:Sorman
Lovell
:Sorman
Lovell
5…
- p. 45 35
Borman Yes, and you really fee l SEP ADAP'l'. It felt like I had…
- p. 46 …used to zero g fl i ght.
Borman The only thing I could do was fly…
- p. 47 37
Borman
• Lovell
BormA.n
Lovell
Borman
Lovell
'Borman
Lovel 1
Borman
Sheparn.
Lovell
l3omP.n…
- p. 48 Lovell
Bonnan
Lovell
Bom"'n
J,ove) 1
Borman
Lovell
"'Borman
T,ovell
That ' s a…
- p. 49 …s t or;y w?. s there.
Borman 'P.;e :-'DI as .fA.r as the…
- p. 51 41
Borman That was right on the money. The retro pack jettison was
accomplished 45 seconds…
- p. 52 …5.10 Post Retro Jettison Checklist
Borman The post retro jettison checklist was accomplished with no…
- p. 53 …find out where the horizon is and- -
Borman That was a heck of a thing. I…
- p. 55 …Because when he was right on.
:Borman You said we were overshooting &11 the time.
Lovell…
- p. 56 Lovell Yes.
Borman During the later part of it I started out in PULSE Mode and…
- p. 57 …3 Aceelera.tio!!,_Pro.file
Borman Okay. The acceleration profile was very smallo It was a…
- p. 58 …6.5 lOOK Feet
Borman I started losing it; I think we may have run out…
- p. 59 49
Borman We'll have to see. We don't have readings on that .
Lovell Okay…
- p. 60 …Why?
Borman I took my hood off to try to find the horizon , so I made…
- p. 61 …reef ed con<lition for 3 months .
Borman It seemed like it s tayed reefed for…
- p. 62 …6.14 2X Checklist
Borman 2,000 foot checklist we accomplished with no problem. About
this…
- p. 63 …were just too hot and too beat .
:Borman It was even hot in the spacecraft, so…
- p. 64 …Lovell We got called up from the MCC
Borman But , anyway, we didn ' t do it…
- p. 65 55
Lovell
Borman
Lovell
Borman
Lovell
BoI'J'llan
Love11
Borman
Lovell
Borman
Lovell
we hit…
- p. 66 …We opened up t he repress valve; di d we have
the cabin fan on?
Borman…
- p. 67 …ay pl anet troubl e or something.
Borman Communi cations wi t h recovery forces on…
- p. 68 58
Lovell
Boman
J.ovel l
Boman
LoveJl
Boman
Lovell
Borman
cross range .
Did you have…
- p. 69 …and 4 dirl not move from zero.
Borman And then you turned off squib batteries land…
- p. 70 …RCS f umes , I do not know.
Borman The main chute was perf ect .
Lovell Looked…
- p. 71 …I did not see a:ny leaks.
Borman Electrical Power: We mentioned we had 1 and…
- p. 72 …6 Postlanding Activity
Borman Postlanding act ivity was well organized. We were a li t t…
- p. 73 …7 Com f ort
Borman It gets pretty wa rm in that sp~cecraft. I would…
- p. 74 …1 Ple.tfom
Borman We aligned the platform 3 t imes. W:ach time it worked…
72
Lovell No. I did not hear the thrust ers. One reason why we didn't
hea.r the thrusters in t h.at particular case, whereas we did
later on, was the fact t ha.t we ha.d our hoods on and the air
was blowing in and making a l ot of noise. It Wl!.S strictly
by feel and by sight. No sound.
Borman Right. Peri gee Adjuat Translati on. Accel erometer bias was
what they thought it was prelaunch, and it remained that way
throughout the f light. This was a. no platform Perigee
Adjust, so, really that doesn' t have any meaning there. The
timing on the first Peri get Adjust Maneuver was off, thanks
to me. Jim ma.de the maneuver. We did it without a platform
on a. star. And, as I mentioned earlier, about this time we
were in cl ose proximity to the booster, and we started fly
ing through some particles, but I wa.s not sure exactly what
it was, so I told him to stop thrusting as we approached
this. Then, when we got in there, when we stopped th.rusting,
this wire came forward, hi t the hatch, and I lost the timing
again. We thrusted, I guess , a little too l ong. I a.m not
sure exactly how l ong i t was. I think we were aiming for a.
perigee of about 102, and ended up with about 120. M.&¥be
they changed their minds and went for a perigee of 120.
don't know.
Lovell Well, that time which they gave us was not consistent with
I
About this file
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.