Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
65
SF.F worked perfectly. BEF worked perfectly. ORB RATE
s eemed to be fine , We used it preparing for the rendezvous
with Spacecraft 6. After running OP.BRATS fo r
approximately an hour , and then going back to align S P.P ,
we did not notice a great amount of misalignment. ?he
only time it was on F'RF:E was during reentry, I cuess the
FREF. worked fine .
Lovell No probl em about displays , were there ?
Boman lfo , not at all ,
Lovell Been using- them for a couple of years now.
'Borman No prob l em about contro l s . ~'h~ PLATFORM mode worked
well , During our last alienment, we had degraried opera....ion
in thrusters~ and 4; so we aliened it manually f or 2
orbits . It was very easy to no , ann it worked fine .
We had eJ l the confidP-nce in the worl ri as far A. S atti tude
reference is concerned,
8 . 2 OAJIS
'Rorinan OAMS operational check, Pad: I tr.ink we went arnunn
the horn about~ times before they were satisfieri.
Lovel 1 It took three circuits to s et them ,
Borman Ri gr t , Inflight O~J~S : The on ly ooerati0nal er.eek we harl
is when we lost the complete authority in yaw richt,
thrusters 3 and 4, We noticed this first 1n PULSE mode;
•

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.