Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
64
7.11 Crew Pick Up
Boman The crew pick up was nominal.
Lovell Nothing else. Everything was fine .
8.0 SYSTEMS OPERATION
8 . 1 Ple.tfom
Borman We aligned the platform 3 t imes. W:ach time it worked
just as advertised. Daytime alignrnent,of course,was no
prob] em. We got very ample yaw reference out the window.
Lovell Caging, for fast heat dropout took approximately 23
minutes.
Boman Night time, the initial alignment is a litt1e difficult i f
you do not have a full moon. With a fu 1 1 moon it is al
most as easy at night as it is in the daytime. It rea 1.ly
lit the terrain up.
Lovell To get your initial spacecraft attitude, the full moon
is very nice .
Borman Right, without a full moon, I think it woul d take you a
little while to align to get your Spacecraft BEF, so that
you would not have to torque the platfom too far for
alignment.
Lovell You get to know the stars.
"!3orman Yes, you have to use the stars . It would be difficult
to pick up the ground and track it. Platform Morles: CAGE.
Jim ~aid that took 23 minutes for a fast heat drop out.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.