Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
56
ann doing the blood pressure work. And that compl icates
the recovery phase of it quite a bit .
Bonnan Yes .
Lovel l I think it also compromised the blood pressures that way
too.
Borman We didn't feel like running foot races when we finally hit
the water. We had planned to get out of our pressure
suits into that orbital flight suit, but the effort was
just too great . So,we jus t opened t he repress valve to get
some more cooling in there and sat .
Love l 1 That ' s right . We opened up t he repress valve; di d we have
the cabin fan on?
Borman No, we didn ' t have t he cabin f an on . He had the snorkle
val ve with the suit fans and t he o2 HI HATE and the re
press valve open.
Borman The checklists were all right then as far as you 're con-
cerned?
Lovell Yes. I thought the recovery phase was very good. I t hink
I missed one or two. I know I didn ' t turn all the s tack
switches off, but the power and control switches were off
during the reentry phase; so, there was no problem there .
7 , 3 Communications
Boman UHF. We had communicat ions with Air Boss whi l e we were
still on the chute, and we had very good communications

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.