Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
53
swimmers there in a.bout 4 minutes, and so I put the HF
antenna back down to keep it from getting da.maged. And we
conducted the electrical check. I musts~ that I'm gl ad
that the electrical check was simple, because it was hot in
there, and we were tired. I was worried about this before
and I would never have been able to sit there Blld go t hrough
this complicated, long check.
Lovell We had both pl8l'llled, that what we were going to do was take
off our suits in the spacecraft, and wear our orbital flight
suits. And I think that we probably would never have gotten
out of the suits, because we were just too hot and too beat .
:Borman It was even hot in the spacecraft, so Jim came through with
the idea of opening the :repress valve, and this wa.s great.
We bad a.11 that oxygen and you weren't going to use it. It
blew all that cool oxygen out and we had o2 HI RATE and the
snorkel on. So we stqed pretty cool when you get right
down to it. So it was a. good idea. I don't know if you got
the blood pressure measurements or not, did you?
6.17 Blood pressure measurement
Lovell I took them, I don't know whether they came out or not. I
put the reprogre.mmer on in the water and started ta.king blood

About this file